Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality Regulations, 2021 — First Amendment, 2024

Maharashtra Electricity Regulatory Commission (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) (First Amendment) Regulations, 2024

AmendmentDated 5 Jul 2024MERC/Tech/Regulation/2024/0402 dated 5th July, 2024

Amends the Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality Regulations, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Maharashtra Electricity Regulatory Commission's first amendment to its 2021 Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality Regulations, notified as No. MERC/Tech/Regulation/2024/0402 and signed in Mumbai on 5 July 2024 (p6, p10). It changes the parent regulations in seven places and takes effect from the date of publication in the Official Gazette.

After the opening clauses, Regulation 2 gains two reliability indices as new defined terms, CAIFI and MAIFI (p6). In the connection chapter, the second proviso to Regulation 5.8 is replaced by a timeline table distinguishing connections released from the existing network (metropolitan, other municipal and rural areas) from those needing augmentation or a new substation; a new Regulation 5.9 then gives an existing consumer a right to a separate connection for EV charging, with the same timelines and a sub-meter option for HT EV charging or battery swapping (p7).

Regulation 15 is rewritten in several places — billing and replacement for lost, burnt or defective meters and when the meter's price may be recovered from the consumer; remote monthly reading of prepayment meters with consumer data access and daily data for smart prepaid meters; a 30-day deadline for testing a meter on complaint, with a five-day additional-meter verification option; and publication of the NABL accredited laboratory list (p7–8).

Regulation 22 gains a 24x7 supply obligation with a carve-out allowing the Commission to specify lower supply hours for categories such as agriculture, and the CAIFI and MAIFI formulas are added to its reliability reporting clause (p8–9). Regulation 28 gains an outage monitoring and restoration mechanism obligation (p9), and the first compensation entry in Annexure-II is substituted (p10).

Standard name
Electricity Supply Code, Standards of Performance
Primary topics
Standards of performance, Conditions of supply, New connections and load changes

Read with this

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document