Maharashtra Electricity Regulatory Commission (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) (First Amendment) Regulations, 2024
AmendmentDated 5 Jul 2024MERC/Tech/Regulation/2024/0402 dated 5th July, 2024
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Maharashtra Electricity Regulatory Commission's first amendment to its 2021 Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality Regulations, notified as No. MERC/Tech/Regulation/2024/0402 and signed in Mumbai on 5 July 2024 (p6, p10). It changes the parent regulations in seven places and takes effect from the date of publication in the Official Gazette.
After the opening clauses, Regulation 2 gains two reliability indices as new defined terms, CAIFI and MAIFI (p6). In the connection chapter, the second proviso to Regulation 5.8 is replaced by a timeline table distinguishing connections released from the existing network (metropolitan, other municipal and rural areas) from those needing augmentation or a new substation; a new Regulation 5.9 then gives an existing consumer a right to a separate connection for EV charging, with the same timelines and a sub-meter option for HT EV charging or battery swapping (p7).
Regulation 15 is rewritten in several places — billing and replacement for lost, burnt or defective meters and when the meter's price may be recovered from the consumer; remote monthly reading of prepayment meters with consumer data access and daily data for smart prepaid meters; a 30-day deadline for testing a meter on complaint, with a five-day additional-meter verification option; and publication of the NABL accredited laboratory list (p7–8).
Regulation 22 gains a 24x7 supply obligation with a carve-out allowing the Commission to specify lower supply hours for categories such as agriculture, and the CAIFI and MAIFI formulas are added to its reliability reporting clause (p8–9). Regulation 28 gains an outage monitoring and restoration mechanism obligation (p9), and the first compensation entry in Annexure-II is substituted (p10).
Read with this
The regulation
Commencement notices and reasons
Procedures and orders made under it
- Dated 1 Mar 2021Practice Directions under Supply Code and Standards of Performance Regulations, 2021
- Dated 26 May 2021Revision of Contract Demand in a Billing Cycle — Practice Direction, 2021
- Dated 26 Dec 2023Practice Directions under the Electricity Supply Code and Standards of Performance Regulations, 2021 — disclaimers on new-connection applications and electricity bills, 2023
- Dated 22 Jul 2024Practice Directions under the Electricity Supply Code and Standards of Performance Regulations, 2021 — 2024
Other copies of these documents (1)
5 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft, 1 copy in another language, 1 draft or notice on a draft not held as English text and 1 procedure or order made under it not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.