Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Revision of Contract Demand in a Billing Cycle — Practice Direction, 2021

REVISION OF CONTRACT DEMAND IN A BILLING CYCLE

OrderDated 26 May 2021

Made under the Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality Regulations, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A MERC practice direction issued on 26 May 2021 governing how often a consumer may revise Contract Demand within a billing cycle and how the bill is worked out when a revision takes effect mid-cycle (p1, p3).

The preamble (pp1–2) recounts the earlier practice direction of 21 May 2020 — issued under Regulation 22 of the 2005 Supply Code Regulations — which allowed three revisions per billing cycle for HT industrial and commercial consumers and two for LT industrial and commercial consumers, and was valid till 31 March 2021. It records the consumer petition in Case No. 25 of 2021, the Commission's order of the same date citing the need to help industrial and commercial consumers recover from the Covid-19 lockdown, and the fact that the 2021 Supply Code and Standards of Performance Regulations (25 February 2021) repealed the 2005 Supply Code Regulations and the 2014 Standards of Performance Regulations. It quotes Regulation 7.6 on revision of Contract Demand on application, including regularisation where a consumer exceeds Contract Demand three times in a financial year, and notes that Regulation 7.6 does not say how many revisions are allowed in a billing cycle.

The operative clauses (a)–(k) (pp3–4) set the number of revisions allowed per billing cycle for HT and for LT industrial and commercial consumers; restrict the maximum Load Factor Incentive for HT consumers after a second revision, with restoration in a later cycle if the option is not exercised; require three days' advance application; require the licensee to give effect from the requested date subject to technical feasibility and to metering CT/PT limits; floor reductions at the minimum threshold Contract Demand for the tariff category; link revision to corresponding revision of open access permission; protect rooftop net-metering capacity; apportion demand-linked bill components (demand charges, penalty for exceeding Contract Demand, LFI) across the intervals before and after each revision; and prescribe AMR/MRI data handling with average-billing fallback. It applies prospectively and is valid till 31 March 2022 (p4).

Standard name
Electricity Supply Code, Standards of Performance
Primary topics
New connections and load changes, Billing and payment, Conditions of supply

Read with this

Other copies of these documents (1)

5 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft, 1 copy in another language, 1 draft or notice on a draft not held as English text and 1 procedure or order made under it not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document