Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Practice Directions under Supply Code and Standards of Performance Regulations, 2021

PRACTICE DIRECTIONS UNDER MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (ELECTRICITY SUPPLY CODE AND STANDARDS OF PERFORMANCE OF DISTRIBUTION LICENSEES INCLUDING POWER QUALITY) REGULATIONS, 2021

OrderDated 1 Mar 2021

Made under the Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality Regulations, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

MERC issues a short practice direction telling distribution licensees how to handle site inspection and the fixing of the point of supply when releasing a new electricity connection, so that the consumer is not required to be present for the utility's internal technical work. The background (p1–3) explains that the Supply Code, 2021 mandates digital application, payment and status tracking, and that it had deliberately removed timelines for the inspection of premises under Regulation 6.1 because that inspection is a utility-level activity assessing network capacity and possible augmentation. The Commission quotes Regulation 6 in full (p2) and notes the intent of the Code is to keep the consumer informed at every step. It concludes that the Regulation 6.1 inspection can be done without consumer interaction or presence, cutting the number of consumer touch points to two.

The operative direction (p3) has two limbs: after receiving the application, the licensee must examine technical feasibility from its distribution system or mains without interacting with the applicant; and, once satisfied that supply can be energised (existing or post-augmentation), it must install the meter at site in the presence of the consumer. Any required alteration to the consumer's installation can be intimated during that visit, and the connection released after compliance. If defects or deficiencies are found on inspection, the licensee must tell the applicant on the spot in writing. The direction took effect on the date of issue, 01 March 2021 (p3).

Standard name
Electricity Supply Code, Standards of Performance
Primary topics
New connections and load changes, Metering

Read with this

Other copies of these documents (1)

5 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft, 1 copy in another language, 1 draft or notice on a draft not held as English text and 1 procedure or order made under it not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document