Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Practice Directions under the Electricity Supply Code and Standards of Performance Regulations, 2021 — 2024

PRACTICE DIRECTIONS UNDER MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (ELECTRICITY SUPPLY CODE AND STANDARDS OF PERFORMANCE OF DISTRIBUTION LICENSEES INCLUDING POWER QUALITY) REGULATIONS, 2021

OrderDated 22 Jul 2024

Made under the Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality Regulations, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This one-page practice direction from the Maharashtra Electricity Regulatory Commission, dated 22 July 2024, operationalises the public-disclosure requirements of the MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) Regulations, 2021 (the Supply Code, 2021) (p1).

It notes that most of the Business Reform Action Plan, 2024 (BRAP, 2024) parameters for obtaining electricity connections are already covered by the Supply Code, 2021; the only gap is a public dashboard on new connections and supply interruptions, which the Commission therefore requires (p1–2).

Under Regulation 29 of the Supply Code, 2021, the direction requires every Distribution Licensee to develop a public dashboard showing division-wise data on new connections (applications received, connections released, time taken, charges levied) and division-wise reliability and quality-of-supply parameters — average hours of steady supply voltage per week, number and hours of interruptions per week, and reasons for interruptions (p2).

The dashboard must be developed within one month of issuance and updated in real time or at least weekly, with the date and time of updating clearly displayed (p2). It is signed by the Chairperson and two Members.

Standard name
Electricity Supply Code, Standards of Performance
Primary topics
New connections and load changes, Standards of performance, Power quality

Read with this

Other copies of these documents (1)

5 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft, 1 copy in another language, 1 draft or notice on a draft not held as English text and 1 procedure or order made under it not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document