MERC · Maharashtra Electricity Regulatory Commission
Practice Directions under the Electricity Supply Code and Standards of Performance Regulations, 2021 — 2024
PRACTICE DIRECTIONS UNDER MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (ELECTRICITY SUPPLY CODE AND STANDARDS OF PERFORMANCE OF DISTRIBUTION LICENSEES INCLUDING POWER QUALITY) REGULATIONS, 2021
OrderDated 22 Jul 2024
Made under the Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality Regulations, 2021.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This one-page practice direction from the Maharashtra Electricity Regulatory Commission, dated 22 July 2024, operationalises the public-disclosure requirements of the MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) Regulations, 2021 (the Supply Code, 2021) (p1).
It notes that most of the Business Reform Action Plan, 2024 (BRAP, 2024) parameters for obtaining electricity connections are already covered by the Supply Code, 2021; the only gap is a public dashboard on new connections and supply interruptions, which the Commission therefore requires (p1–2).
Under Regulation 29 of the Supply Code, 2021, the direction requires every Distribution Licensee to develop a public dashboard showing division-wise data on new connections (applications received, connections released, time taken, charges levied) and division-wise reliability and quality-of-supply parameters — average hours of steady supply voltage per week, number and hours of interruptions per week, and reasons for interruptions (p2).
The dashboard must be developed within one month of issuance and updated in real time or at least weekly, with the date and time of updating clearly displayed (p2). It is signed by the Chairperson and two Members.
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
- Dated 1 Mar 2021Practice Directions under Supply Code and Standards of Performance Regulations, 2021
- Dated 26 May 2021Revision of Contract Demand in a Billing Cycle — Practice Direction, 2021
- Dated 26 Dec 2023Practice Directions under the Electricity Supply Code and Standards of Performance Regulations, 2021 — disclaimers on new-connection applications and electricity bills, 2023
Other copies of these documents (1)
5 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft, 1 copy in another language, 1 draft or notice on a draft not held as English text and 1 procedure or order made under it not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.