MERC · Maharashtra Electricity Regulatory Commission
Supply Code and Standards of Performance (including Power Quality) Regulations, 2021 — Statement of Reasons
MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (ELECTRICITY SUPPLY CODE AND STANDARDS OF PERFORMANCE FOR DISTRIBUTION LICENSEES, INCLUDING POWER QUALITY) REGULATIONS, 2021
Statement of reasonsDated 24 Feb 2021
The commission's reasons for the Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality Regulations, 2021 or one of its amendments.
Summary
Summary written by software, from pages 1 to 30 of 131. Check the regulator's original before you rely on it.
This is MERC's Statement of Reasons (SoR) for the Maharashtra Electricity Regulatory Commission (Electricity Supply Code and Standards of Performance for Distribution Licensees, including Power Quality) Regulations, 2021, dated 24 February 2021 (p1). It explains why the Commission merged the Electricity Supply Code Regulations, 2005 and the Standards of Performance Regulations, 2014 into a single instrument, aligned them with the FOR Model Supply Code, the Grid Code (MEGC 2020), the MYT Regulations 2019 and the Consumer Grievance Redressal Forum Regulations 2020, and used the opportunity to introduce power-quality obligations (pp1–3). The draft Regulations and Explanatory Memorandum were published on 8 December 2020; 183 stakeholders commented by 29 December 2020 (p3), and clauses were also adjusted to match the Electricity (Rights of Consumers) Rules, 2020 notified on 31 December 2020 (p4).
The SoR is organised chapter-by-chapter in the same order as the draft Regulations, summarising each comment and stating the Commission's ruling. Chapter 1 (pp5–17) works through the definitions — Applicant, Average Power Factor, Consumer class, Dedicated Distribution Facilities, Designated Consumers, Maximum Demand, Meter, Point of Supply, Smart Meter, Temporary Supply and the power-quality parameters — accepting some changes (billing period, 15-minute demand block with a transition proviso, a communication-accessory proviso on faulty meters) and rejecting others (dynamic time blocks, generic Designated Consumer categories, a general 'working hours' definition). Chapter 2 (pp18–27) deals with the system of supply and classification of installations: adding Extra High Voltage to the systems of supply, replacing Contract Demand with 'Sanctioned Load / Contract Demand', extending the metropolitan-area exception state-wide, and adding provisos on voltage surcharge, multiple/standby sources, cost sharing between original and subsequent consumers, and additional fixed charges; the draft load-estimation regulation and its annexure were dropped. Chapter 3 begins the treatment of recovery of charges, reimbursements for EHT network cost, service-line charges and the Schedule of Charges.
Annexure "A" lists the stakeholders whose comments were considered (p3).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
- Dated 1 Mar 2021Practice Directions under Supply Code and Standards of Performance Regulations, 2021
- Dated 26 May 2021Revision of Contract Demand in a Billing Cycle — Practice Direction, 2021
- Dated 26 Dec 2023Practice Directions under the Electricity Supply Code and Standards of Performance Regulations, 2021 — disclaimers on new-connection applications and electricity bills, 2023
- Dated 22 Jul 2024Practice Directions under the Electricity Supply Code and Standards of Performance Regulations, 2021 — 2024
Other copies of these documents (1)
5 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft, 1 copy in another language, 1 draft or notice on a draft not held as English text and 1 procedure or order made under it not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.