Skip to content

MPERC · Madhya Pradesh Electricity Regulatory Commission

Madhya Pradesh Electricity Supply Code 2021 — Third Amendment, 2024

Madhya Pradesh Electricity Supply Code 2021 (Third Amendment) [ARG-1(II)(iii) of 2024]

AmendmentDated 24 May 2024No. MPERC /2024/1239 dated 24th May 2024

Amends the Madhya Pradesh Electricity Supply Code, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Third Amendment to the Madhya Pradesh Electricity Supply Code, 2021, issued by MPERC on 24 May 2024 (p1). It is a short amending instrument — four operative clauses — that edits the Principal Code's definitions chapter, its consumer-connection chapter and its metering/billing chapter. It comes into force from the date of Gazette publication; that date is not printed in the text (p1).

Chapter 2 amendments insert a definition of "Owner" and replace the definition of "Group user or Resident Welfare Association" (p1). Chapter 4 is where the substantive change sits: clause 4.65's seven-day requirement is replaced by "immediately"; five new provisos after 4.67 require the distribution licensee to give a Resident Welfare Association either a single point connection or individual connections, decided by a transparent ballot of owners with a fifty percent threshold, and to split metering, billing and collection responsibility accordingly (p1–2); two new provisos after 4.83 tie billing to the Commission's retail supply tariff order and allow the RWA to charge a sub-distribution network cost determined in that order (p2–3); clause 4.84 is tidied and two provisos added allowing a separate connection for EV charging and domestic-connection EV charging for independent houses (p3).

Chapter 8 is amended by substituting clause 8.24, which sets meter-testing and additional-meter installation timelines, and clause 8.52, which specifies what a consumer bill must contain and requires billing formats in English and Hindi (p3–4).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Billing and payment, Metering

Read with this

The regulation

Commencement notices and reasons

Other copies of these documents (1)

8 more documents belong here and are not on Voltaic: 7 copies in another language and 1 commencement notice or statement of reasons.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document