MPERC · Madhya Pradesh Electricity Regulatory Commission
Madhya Pradesh Electricity Supply Code 2021 — Third Amendment, 2024
Madhya Pradesh Electricity Supply Code 2021 (Third Amendment) [ARG-1(II)(iii) of 2024]
AmendmentDated 24 May 2024No. MPERC /2024/1239 dated 24th May 2024
Amends the Madhya Pradesh Electricity Supply Code, 2021.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Third Amendment to the Madhya Pradesh Electricity Supply Code, 2021, issued by MPERC on 24 May 2024 (p1). It is a short amending instrument — four operative clauses — that edits the Principal Code's definitions chapter, its consumer-connection chapter and its metering/billing chapter. It comes into force from the date of Gazette publication; that date is not printed in the text (p1).
Chapter 2 amendments insert a definition of "Owner" and replace the definition of "Group user or Resident Welfare Association" (p1). Chapter 4 is where the substantive change sits: clause 4.65's seven-day requirement is replaced by "immediately"; five new provisos after 4.67 require the distribution licensee to give a Resident Welfare Association either a single point connection or individual connections, decided by a transparent ballot of owners with a fifty percent threshold, and to split metering, billing and collection responsibility accordingly (p1–2); two new provisos after 4.83 tie billing to the Commission's retail supply tariff order and allow the RWA to charge a sub-distribution network cost determined in that order (p2–3); clause 4.84 is tidied and two provisos added allowing a separate connection for EV charging and domestic-connection EV charging for independent houses (p3).
Chapter 8 is amended by substituting clause 8.24, which sets meter-testing and additional-meter installation timelines, and clause 8.52, which specifies what a consumer bill must contain and requires billing formats in English and Hindi (p3–4).
Read with this
The regulation
- Dated 12 Aug 2021Madhya Pradesh Electricity Supply Code, 2021
Amendments and corrections
- Dated 7 Dec 2023Madhya Pradesh Electricity Supply Code, 2021 — First Amendment, 2023
- Dated 17 Jan 2024Madhya Pradesh Electricity Supply Code, 2021 — Second Amendment
- Dated 26 Jun 2024Madhya Pradesh Electricity Supply Code 2021 — Fourth Amendment, 2024
- Dated 27 Mar 2025Madhya Pradesh Electricity Supply Code, 2021 — Fifth Amendment, 2025
- Dated 16 Sep 2026Madhya Pradesh Electricity Supply Code, 2021 — Sixth Amendment, 2026
Commencement notices and reasons
- Dated 16 Sep 2026MP Gazette Notification dated 18-SEP-2026
Other copies of these documents (1)
- Dated 26 Jun 2024Madhya Pradesh Electricity Supply Code 2021 — Fourth Amendment, 2024
8 more documents belong here and are not on Voltaic: 7 copies in another language and 1 commencement notice or statement of reasons.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.