Madhya Pradesh Electricity Supply Code 2021 — Fourth Amendment, 2024

Madhya Pradesh Electricity Supply Code 2021 (Fourth Amendment) [ARG-1(II)(iv) of 2024]

Amendment · Gazette copyDated 26 Jun 20241539/MPERC /2024 dated 26th June 2024

The Gazette copy of the Madhya Pradesh Electricity Supply Code 2021 — Fourth Amendment, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Fourth Amendment to the Madhya Pradesh Electricity Supply Code, 2021, issued by MPERC as No. 1539/MPERC/2024 from Bhopal on 26 June 2024, with commencement tied to publication in the State Gazette (p4). It is a short, targeted amendment with four operative clauses.

Clause 2 inserts a new definition into Chapter 2: "Metropolitan Area", tied to areas notified by the State Government under Article 243P(c) of the Constitution (74th Amendment) Act 1992 and s.4 of the MP Nagar Tatha Gram Nivesh Adhiniyam 1973 (p4). That definition then drives the new service time limit in clause 4.25.

Clause 3 amends Chapter 4 in several places (p4–5): it makes outstanding electricity dues a charge on the assets of a company, firm or individual in clause 4.17; inserts a short service timeline for metropolitan areas into clause 4.25; adds identical provisos to clauses 4.35 and 4.38 barring recovery of load-reassessment charges once the licensee has charged for extension of distribution mains; and replaces the method for computing the maximum demand of a Group Housing Society in clause 4.84(e)(4) with a 15-minute time-block subtraction of member-consumer demands.

Clause 4 updates two cross-references in Annexure 5: the internal reference in clause 13(d) moves to the 2021 Code as amended, and clause 39 replaces the CEA (Measures relating to Safety and Electric Supply) Regulations, 2010 with the 2023 Regulations (p5–6).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Connection and miscellaneous charges, Billing and payment

Read with this

The regulation

Commencement notices and reasons

8 more documents belong here and are not on Voltaic: 7 copies in another language and 1 commencement notice or statement of reasons.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document