Skip to content

MPERC · Madhya Pradesh Electricity Regulatory Commission

Madhya Pradesh Electricity Supply Code 2021 — Fourth Amendment, 2024

Madhya Pradesh Electricity Supply Code 2021 (Fourth Amendment) [ARG-1(II)(iv) of 2024]

AmendmentDated 26 Jun 2024No. 1539/MPERC /2024 dated 26.06.2024

Amends the Madhya Pradesh Electricity Supply Code, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Fourth Amendment to the Madhya Pradesh Electricity Supply Code, 2021, issued by MPERC by notification No. 1539/MPERC/2024 dated 26.06.2024 (p1). It makes four targeted changes to the Principal Code and takes effect from the date of Gazette publication — a Gazette date that is not printed in the text (p1).

Clause 2 inserts a new definition, sub-clause (kk1) in clause 2.1, defining "Metropolitan Area" by reference to areas notified by the State Government under Article 243P(c) of the Constitution (74th Amendment) Act 1992 and Section 4 of the MP Nagar Tatha Gram Nivesh Adhiniyam 1973 (p1). That definition is what the rest of the amendment hangs on.

Clause 3 amends Chapter 4 on consumer service. In clause 4.17 it converts the closing colon of the first paragraph into a full stop and inserts a sentence making outstanding electricity dues a charge on the assets of the company/firm/individual (p1). In clause 4.25 it inserts "within three days in Metropolitan Area" into the first sentence, tightening a service timeline for metropolitan areas only (p1–2). It inserts identical provisos into clauses 4.35 and 4.38 barring recovery of reassessment-of-load charges once the licensee has charged for infrastructure for extension of distribution mains (p2). It substitutes clause 4.84(e)(4) with a new methodology for computing the maximum demand of a Group Housing Society by subtracting, block by block, the demands recorded in members' meters from the society's meter (p2).

Clause 4 updates two cross-references in Annexure 5: clause 13(d) now points to the Supply Code 2021 instead of 2013, and clause 39 to the CEA (Measures relating to Safety and Electric Supply) Regulations, 2023 instead of 2010 (p2–3).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, Connection and miscellaneous charges, Billing and payment

Read with this

The regulation

Commencement notices and reasons

Other copies of these documents (1)

8 more documents belong here and are not on Voltaic: 7 copies in another language and 1 commencement notice or statement of reasons.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document