MPERC · Madhya Pradesh Electricity Regulatory Commission
Madhya Pradesh Electricity Supply Code 2021 — Fourth Amendment, 2024
Madhya Pradesh Electricity Supply Code 2021 (Fourth Amendment) [ARG-1(II)(iv) of 2024]
AmendmentDated 26 Jun 2024No. 1539/MPERC /2024 dated 26.06.2024
Amends the Madhya Pradesh Electricity Supply Code, 2021.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Fourth Amendment to the Madhya Pradesh Electricity Supply Code, 2021, issued by MPERC by notification No. 1539/MPERC/2024 dated 26.06.2024 (p1). It makes four targeted changes to the Principal Code and takes effect from the date of Gazette publication — a Gazette date that is not printed in the text (p1).
Clause 2 inserts a new definition, sub-clause (kk1) in clause 2.1, defining "Metropolitan Area" by reference to areas notified by the State Government under Article 243P(c) of the Constitution (74th Amendment) Act 1992 and Section 4 of the MP Nagar Tatha Gram Nivesh Adhiniyam 1973 (p1). That definition is what the rest of the amendment hangs on.
Clause 3 amends Chapter 4 on consumer service. In clause 4.17 it converts the closing colon of the first paragraph into a full stop and inserts a sentence making outstanding electricity dues a charge on the assets of the company/firm/individual (p1). In clause 4.25 it inserts "within three days in Metropolitan Area" into the first sentence, tightening a service timeline for metropolitan areas only (p1–2). It inserts identical provisos into clauses 4.35 and 4.38 barring recovery of reassessment-of-load charges once the licensee has charged for infrastructure for extension of distribution mains (p2). It substitutes clause 4.84(e)(4) with a new methodology for computing the maximum demand of a Group Housing Society by subtracting, block by block, the demands recorded in members' meters from the society's meter (p2).
Clause 4 updates two cross-references in Annexure 5: clause 13(d) now points to the Supply Code 2021 instead of 2013, and clause 39 to the CEA (Measures relating to Safety and Electric Supply) Regulations, 2023 instead of 2010 (p2–3).
Read with this
The regulation
- Dated 12 Aug 2021Madhya Pradesh Electricity Supply Code, 2021
Amendments and corrections
- Dated 7 Dec 2023Madhya Pradesh Electricity Supply Code, 2021 — First Amendment, 2023
- Dated 17 Jan 2024Madhya Pradesh Electricity Supply Code, 2021 — Second Amendment
- Dated 24 May 2024Madhya Pradesh Electricity Supply Code 2021 — Third Amendment, 2024
- Dated 27 Mar 2025Madhya Pradesh Electricity Supply Code, 2021 — Fifth Amendment, 2025
- Dated 16 Sep 2026Madhya Pradesh Electricity Supply Code, 2021 — Sixth Amendment, 2026
Commencement notices and reasons
- Dated 16 Sep 2026MP Gazette Notification dated 18-SEP-2026
Other copies of these documents (1)
- Dated 26 Jun 2024Madhya Pradesh Electricity Supply Code 2021 — Fourth Amendment, 2024
8 more documents belong here and are not on Voltaic: 7 copies in another language and 1 commencement notice or statement of reasons.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.