Skip to content

MPERC · Madhya Pradesh Electricity Regulatory Commission

Madhya Pradesh Electricity Supply Code, 2021 — Second Amendment

Madhya Pradesh Electricity Supply Code 2021 (Second Amendment) [ARG-1(II)(ii) of 2023]

AmendmentDated 17 Jan 2024No. MPERC / 2023/180 dated 17th January 2024

Amends the Madhya Pradesh Electricity Supply Code, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the second amendment to the Madhya Pradesh Electricity Supply Code, 2021, made by MPERC and issued from Bhopal on 17 January 2024 (p1). It is short and self-contained: clause 1 gives the short title, commencement and territorial extent, and clauses 2 to 4 insert new provisos into three clauses of the Principal Code (p1–2).

The substance is smart-meter-driven automatic revision of load. Once a smart meter is installed, if the recorded maximum demand exceeds the sanctioned load (clause 7.1) or the contract demand (clause 7.2) in at least three billing cycles in a financial year, the load or demand stands automatically revised to the lowest of the exceeded maximum demands, effective from the first day of the first billing cycle of the next financial year, and only where it is technically feasible to serve the higher load from the existing supply arrangement (p1–2). The consumer pays the applicable enhancement charges under the MPERC Recovery of Expenses Regulations 2022 and executes a supplementary agreement; reductions in maximum demand continue to follow the Code (p1–2).

Clause 4 protects consumers from demand-based penalties for the period before the smart meter was installed, and requires that a cycle's bill be raised on the actual recorded maximum demand where it exceeds the sanctioned load or contract demand, with the consumer informed of the change by SMS or mobile app (p2).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Metering, Billing and payment

Read with this

The regulation

Commencement notices and reasons

Other copies of these documents (1)

8 more documents belong here and are not on Voltaic: 7 copies in another language and 1 commencement notice or statement of reasons.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document