Madhya Pradesh Electricity Supply Code, 2021 — Second Amendment
Madhya Pradesh Electricity Supply Code 2021 (Second Amendment) [ARG-1(II)(ii) of 2023]
AmendmentDated 17 Jan 2024No. MPERC / 2023/180 dated 17th January 2024
Amends the Madhya Pradesh Electricity Supply Code, 2021.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the second amendment to the Madhya Pradesh Electricity Supply Code, 2021, made by MPERC and issued from Bhopal on 17 January 2024 (p1). It is short and self-contained: clause 1 gives the short title, commencement and territorial extent, and clauses 2 to 4 insert new provisos into three clauses of the Principal Code (p1–2).
The substance is smart-meter-driven automatic revision of load. Once a smart meter is installed, if the recorded maximum demand exceeds the sanctioned load (clause 7.1) or the contract demand (clause 7.2) in at least three billing cycles in a financial year, the load or demand stands automatically revised to the lowest of the exceeded maximum demands, effective from the first day of the first billing cycle of the next financial year, and only where it is technically feasible to serve the higher load from the existing supply arrangement (p1–2). The consumer pays the applicable enhancement charges under the MPERC Recovery of Expenses Regulations 2022 and executes a supplementary agreement; reductions in maximum demand continue to follow the Code (p1–2).
Clause 4 protects consumers from demand-based penalties for the period before the smart meter was installed, and requires that a cycle's bill be raised on the actual recorded maximum demand where it exceeds the sanctioned load or contract demand, with the consumer informed of the change by SMS or mobile app (p2).
Read with this
The regulation
- Dated 12 Aug 2021Madhya Pradesh Electricity Supply Code, 2021
Amendments and corrections
- Dated 7 Dec 2023Madhya Pradesh Electricity Supply Code, 2021 — First Amendment, 2023
- Dated 24 May 2024Madhya Pradesh Electricity Supply Code 2021 — Third Amendment, 2024
- Dated 26 Jun 2024Madhya Pradesh Electricity Supply Code 2021 — Fourth Amendment, 2024
- Dated 27 Mar 2025Madhya Pradesh Electricity Supply Code, 2021 — Fifth Amendment, 2025
- Dated 16 Sep 2026Madhya Pradesh Electricity Supply Code, 2021 — Sixth Amendment, 2026
Commencement notices and reasons
- Dated 16 Sep 2026MP Gazette Notification dated 18-SEP-2026
Other copies of these documents (1)
- Dated 26 Jun 2024Madhya Pradesh Electricity Supply Code 2021 — Fourth Amendment, 2024
8 more documents belong here and are not on Voltaic: 7 copies in another language and 1 commencement notice or statement of reasons.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.