MPERC · Madhya Pradesh Electricity Regulatory Commission
Madhya Pradesh Electricity Supply Code, 2021 — First Amendment, 2023
Madhya Pradesh Electricity Supply Code 2021 (First Amendment) [ARG-1(II)(i) of 2023]
AmendmentDated 7 Dec 2023No. MPERC / 2023/2741 dated 7th December 2023
Amends the Madhya Pradesh Electricity Supply Code, 2021.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the first amendment to the Madhya Pradesh Electricity Supply Code, 2021 (the 'Principal Code'), issued by MPERC in Bhopal on 7 December 2023 (p1). It comes into force from the date of its publication in the Madhya Pradesh Gazette — that date is not printed — and extends to the whole of Madhya Pradesh (p1). It is a targeted amendment: it rewrites selected definitions and clauses rather than reissuing the Code.
Clause 2 substitutes four definitions in Chapter 2 — authorized load for LT domestic consumers, group user, power factor and temporary connection (p1–2). Clause 3 reworks Chapter 4, setting the regime for temporary supply, including an extension window beyond the sub-two-year temporary period and advance notice periods that scale with load (p2). The bulk of Chapter 4 changes concern group housing societies: how an individual member takes a direct connection from the licensee, metering and final-billing of the switching consumer, sharing of distribution losses and maximum demand between the member and the society, reduction of the society's contract demand, a cap on how many members may take individual connections, and the route by which a society's single-point connection may be terminated (p2–4).
Clause 4 updates Chapter 6 to point to the CEA (Measures relating to Safety and Electric Supply) Regulations, 2023 and restates the conditions for running a consumer's generator in parallel with the licensee's system, plus a disconnection remedy for unconsented parallel operation (p5). Clause 5 amends Chapter 7 on agreements: no fresh initial agreement period on load or voltage change, supply-affording charges on switching to lower voltage, timelines for deciding contract-demand reduction, reduction after the initial period, exemption from agreement for LT domestic and LT single-phase non-domestic consumers, reconnection after government-ordered disconnection, supplementary agreements, and the procedure for terminating an agreement after sixty days of disconnection (p5–8).
Clause 6 covers Chapter 8 metering and billing: reading frequency for smart and other prepaid meters, bill preparation and tariff-change notification, omission of one clause, treatment of audit/vigilance recovery bills and their priority in payment adjustment, assessment when meters are defective (with an appeal route), final bills on vacating premises and no-dues certificates, and a new clause empowering the Commission to issue orders and practice directions on smart prepaid metering implementation (p8–11). Clause 7 sets the order in which consumer payments are appropriated, starting with tax collected at source (p11). Clause 8 inserts force majeure termination rights in Chapter 11 (p11–12). Clauses 9 and 10 retitle Annexures 1 and 2 and delete the standard LT agreement form appended to Annexure 1 (p12).
Read with this
The regulation
- Dated 12 Aug 2021Madhya Pradesh Electricity Supply Code, 2021
Amendments and corrections
- Dated 17 Jan 2024Madhya Pradesh Electricity Supply Code, 2021 — Second Amendment
- Dated 24 May 2024Madhya Pradesh Electricity Supply Code 2021 — Third Amendment, 2024
- Dated 26 Jun 2024Madhya Pradesh Electricity Supply Code 2021 — Fourth Amendment, 2024
- Dated 27 Mar 2025Madhya Pradesh Electricity Supply Code, 2021 — Fifth Amendment, 2025
- Dated 16 Sep 2026Madhya Pradesh Electricity Supply Code, 2021 — Sixth Amendment, 2026
Commencement notices and reasons
- Dated 16 Sep 2026MP Gazette Notification dated 18-SEP-2026
Other copies of these documents (1)
- Dated 26 Jun 2024Madhya Pradesh Electricity Supply Code 2021 — Fourth Amendment, 2024
8 more documents belong here and are not on Voltaic: 7 copies in another language and 1 commencement notice or statement of reasons.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.