MPERC · Madhya Pradesh Electricity Regulatory Commission
Madhya Pradesh Electricity Supply Code, 2021 — Fifth Amendment, 2025
Madhya Pradesh Electricity Supply Code 2021 (Fifth Amendment) [ARG-1(II)(v) of 2025]
AmendmentDated 27 Mar 2025No. 570/MPERC/2025 dated 27.03.2025
Amends the Madhya Pradesh Electricity Supply Code, 2021.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the MPERC notification of 27 March 2025 making the Fifth Amendment to the Madhya Pradesh Electricity Supply Code, 2021 (p1). It is a short, clause-by-clause amending instrument: clause 1 gives the title and commencement, and clauses 2 to 6 each rewrite specific regulations of the Principal Code.
Clause 2 (p1–2) reworks Chapter 2 definitions — inserting "Applicant" to cover owners/occupiers of premises as well as builders, developers, societies and groups of prospective consumers; restating "Consumer" with LT, HT and EHT sub-categories by voltage of supply; and defining "Sanctioned load" in kW/kVA/HP.
Clause 3 (p2–3) replaces Regulation 3.4, the supply-voltage matrix that maps minimum and maximum sanctioned load / contract demand bands to 230 V, 400 V, 11 kV, 33 kV, 132 kV and 220 kV supply, with a proviso letting the licensee deviate for recorded, technically feasible reasons.
Clause 4 (p3–5) is the bulk. It systematically replaces "consumer"/"consumers" with "applicant"/"applicants" across a long list of Chapter 4 regulations on new connections, and substitutes provisions on who pays for extension of distribution mains (Reg 4.3), licensee ownership and maintenance of infrastructure up to the metering point (Reg 4.4), notice to the applicant to take supply (Reg 4.5), temporary agricultural connections (Reg 4.53), dedicated HT industrial feeders (Reg 4.59), supply to new HT applicants from rural feeders (Reg 4.60) and the joint distribution/transmission inspection for EHT connections (Reg 4.62).
Clause 5 (p5) touches metering: "connected load" becomes "sanctioned load" in Reg 6.36 and Reg 6.44 is omitted. Clause 6 (p5–7) rewrites Chapter 7 billing: fixed charges billed on sanctioned load, contract demand per agreement, no refund of connection charges on contract-demand reduction, billing for excess consumption, omission of Reg 7.6(e), and automatic upward revision of sanctioned load once a smart meter records demand above sanctioned load in at least three billing cycles in a financial year (p6).
Everything else is left to the Principal Code, the MPERC Recovery of Expenses Regulations and the annual retail supply tariff orders.
Read with this
The regulation
- Dated 12 Aug 2021Madhya Pradesh Electricity Supply Code, 2021
Amendments and corrections
- Dated 7 Dec 2023Madhya Pradesh Electricity Supply Code, 2021 — First Amendment, 2023
- Dated 17 Jan 2024Madhya Pradesh Electricity Supply Code, 2021 — Second Amendment
- Dated 24 May 2024Madhya Pradesh Electricity Supply Code 2021 — Third Amendment, 2024
- Dated 26 Jun 2024Madhya Pradesh Electricity Supply Code 2021 — Fourth Amendment, 2024
- Dated 16 Sep 2026Madhya Pradesh Electricity Supply Code, 2021 — Sixth Amendment, 2026
Commencement notices and reasons
- Dated 16 Sep 2026MP Gazette Notification dated 18-SEP-2026
Other copies of these documents (1)
- Dated 26 Jun 2024Madhya Pradesh Electricity Supply Code 2021 — Fourth Amendment, 2024
8 more documents belong here and are not on Voltaic: 7 copies in another language and 1 commencement notice or statement of reasons.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.