Skip to content

MPERC · Madhya Pradesh Electricity Regulatory Commission

Madhya Pradesh Electricity Supply Code, 2021 — Fifth Amendment, 2025

Madhya Pradesh Electricity Supply Code 2021 (Fifth Amendment) [ARG-1(II)(v) of 2025]

AmendmentDated 27 Mar 2025No. 570/MPERC/2025 dated 27.03.2025

Amends the Madhya Pradesh Electricity Supply Code, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the MPERC notification of 27 March 2025 making the Fifth Amendment to the Madhya Pradesh Electricity Supply Code, 2021 (p1). It is a short, clause-by-clause amending instrument: clause 1 gives the title and commencement, and clauses 2 to 6 each rewrite specific regulations of the Principal Code.

Clause 2 (p1–2) reworks Chapter 2 definitions — inserting "Applicant" to cover owners/occupiers of premises as well as builders, developers, societies and groups of prospective consumers; restating "Consumer" with LT, HT and EHT sub-categories by voltage of supply; and defining "Sanctioned load" in kW/kVA/HP.

Clause 3 (p2–3) replaces Regulation 3.4, the supply-voltage matrix that maps minimum and maximum sanctioned load / contract demand bands to 230 V, 400 V, 11 kV, 33 kV, 132 kV and 220 kV supply, with a proviso letting the licensee deviate for recorded, technically feasible reasons.

Clause 4 (p3–5) is the bulk. It systematically replaces "consumer"/"consumers" with "applicant"/"applicants" across a long list of Chapter 4 regulations on new connections, and substitutes provisions on who pays for extension of distribution mains (Reg 4.3), licensee ownership and maintenance of infrastructure up to the metering point (Reg 4.4), notice to the applicant to take supply (Reg 4.5), temporary agricultural connections (Reg 4.53), dedicated HT industrial feeders (Reg 4.59), supply to new HT applicants from rural feeders (Reg 4.60) and the joint distribution/transmission inspection for EHT connections (Reg 4.62).

Clause 5 (p5) touches metering: "connected load" becomes "sanctioned load" in Reg 6.36 and Reg 6.44 is omitted. Clause 6 (p5–7) rewrites Chapter 7 billing: fixed charges billed on sanctioned load, contract demand per agreement, no refund of connection charges on contract-demand reduction, billing for excess consumption, omission of Reg 7.6(e), and automatic upward revision of sanctioned load once a smart meter records demand above sanctioned load in at least three billing cycles in a financial year (p6).

Everything else is left to the Principal Code, the MPERC Recovery of Expenses Regulations and the annual retail supply tariff orders.

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Conditions of supply, Billing and payment

Read with this

The regulation

Commencement notices and reasons

Other copies of these documents (1)

8 more documents belong here and are not on Voltaic: 7 copies in another language and 1 commencement notice or statement of reasons.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document