MPERC · Madhya Pradesh Electricity Regulatory Commission
Madhya Pradesh Electricity Supply Code, 2021 — Sixth Amendment, 2026
Madhya Pradesh Electricity Supply Code 2021 (Sixth Amendment) [ARG-1(II)(vi) of 2026]
AmendmentDated 16 Sep 2026Published in the Gazette 18 Sep 2026No. 1511 / MPERC /2026 dated 16.09.2026
Amends the Madhya Pradesh Electricity Supply Code, 2021.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The MPERC's Sixth Amendment to the Madhya Pradesh Electricity Supply Code, 2021 substitutes eight regulations of the Principal Code, all on the consumer-connection side: how a distribution licensee quotes and processes extension of mains, how it estimates load for new complexes and colonies, and what paperwork a consumer must file. It is dated 16.09.2026 and headed "Notified on 18.09.2026", and comes into force from the date of publication in the official Gazette (p1).
Chapter 4 (pp1–4) is the bulk of the amendment. Regulation 4.27 is replaced to fix the licensee's advisory timelines on extension/augmentation requests, covering the charges advised, supervision charges where the applicant lays the line, the agreement, and the test report or self-declaration. Regulations 4.35 and 4.38 replace the load-assessment bases — built-up area for multi-consumer complexes, plot area for housing colonies, with separate categories for EWS and informal-sector/slum connections. Both carry the same architecture: declared load for common facilities, reassessment liability if the developer later builds instead of selling plots, security deposit based on declared load, exemption for Government of MP rural rehabilitation/resettlement complexes, and a proviso barring reassessment charges once the infrastructure has been charged. Regulation 4.42 sets out how the licensee first examines government or REC-type funding before demanding the applicant's deposit, and the timelines for testing and energisation.
Chapter 6 (p4) substitutes 6.1 and 6.23: consumer wiring must conform to the CEA safety Regulations, 2023 and BIS/ISI specifications and be done by a licensed contractor, with a self-declaration route for LT consumers up to 150 kW, plus a procedure for the licensee's inspection and report. Chapter 7 (p5) substitutes 7.6 and 7.10, listing what a consumer must furnish for enhanced load and for reduction in contract demand.
Read with this
The regulation
- Dated 12 Aug 2021Madhya Pradesh Electricity Supply Code, 2021
Amendments and corrections
- Dated 7 Dec 2023Madhya Pradesh Electricity Supply Code, 2021 — First Amendment, 2023
- Dated 17 Jan 2024Madhya Pradesh Electricity Supply Code, 2021 — Second Amendment
- Dated 24 May 2024Madhya Pradesh Electricity Supply Code 2021 — Third Amendment, 2024
- Dated 26 Jun 2024Madhya Pradesh Electricity Supply Code 2021 — Fourth Amendment, 2024
- Dated 27 Mar 2025Madhya Pradesh Electricity Supply Code, 2021 — Fifth Amendment, 2025
Commencement notices and reasons
- Dated 16 Sep 2026MP Gazette Notification dated 18-SEP-2026
Other copies of these documents (1)
- Dated 26 Jun 2024Madhya Pradesh Electricity Supply Code 2021 — Fourth Amendment, 2024
8 more documents belong here and are not on Voltaic: 7 copies in another language and 1 commencement notice or statement of reasons.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.