MPERC · Madhya Pradesh Electricity Regulatory Commission
Madhya Pradesh Electricity Supply Code, 2021
Madhya Pradesh Electricity Supply Code, 2021 {No. RG-I(ii) of 2021}
CodeDated 12 Aug 2021No. 1173/MPERC/ dated 12th August 2021
6 amendments to it are on Voltaic, the latest dated 16 Sep 2026.
Summary
Summary written by software, from pages 1 to 26 of 92. Check the regulator's original before you rely on it.
MPERC issued the Madhya Pradesh Electricity Supply Code, 2021 in Bhopal on 12 August 2021, replacing the 2013 Supply Code to align with the Ministry of Power’s Electricity (Rights of Consumers) Rules, 2020 (p1). It applies across Madhya Pradesh to all persons in transmission and supply under Section 14 of the Electricity Act and to consumers, and takes effect on publication in the MP Gazette (p1).
Chapter 1 gives the short title, extent and commencement (p1). Chapter 2 defines core terms used by licensees and consumers — agreement, connected load, contract demand, consumer categories, group user, temporary connection, power factor and related concepts (p2–5). Chapter 3 fixes system frequency and voltage levels (LT, HT, EHT), permissible voltage variation, and maps supply voltage to contract/connected load; consumer classification follows Commission tariff orders (p6–7).
Chapter 4 is the operational core for new supply (p8–21). It sets the licensee’s obligation to supply, who pays for extension and upgrading, application and acknowledgement procedures (including online portal/mobile app), inspection and testing, and connection time limits. It details special cases: multi-consumer complexes, housing colonies, agriculture pump sets, public street lighting, temporary and Tatkal connections, HT and EHT supply, and group users such as cooperative housing societies. It cross-refers charges to MPERC recovery regulations and penalties to performance standards.
Chapter 5 covers point of supply, dedicated feeders, licensee equipment in consumer premises, fuse failure and interruption/discontinuation (p22–23). Chapter 6 prescribes consumer-side wiring and apparatus standards: safety regulation compliance, mains, switches/fuses, balancing, earthing, domestic appliance circuits, motor starting current limits, and power-factor correction through capacitors (p24–26).
Read with this
Amendments and corrections
- Dated 7 Dec 2023Madhya Pradesh Electricity Supply Code, 2021 — First Amendment, 2023
- Dated 17 Jan 2024Madhya Pradesh Electricity Supply Code, 2021 — Second Amendment
- Dated 24 May 2024Madhya Pradesh Electricity Supply Code 2021 — Third Amendment, 2024
- Dated 26 Jun 2024Madhya Pradesh Electricity Supply Code 2021 — Fourth Amendment, 2024
- Dated 27 Mar 2025Madhya Pradesh Electricity Supply Code, 2021 — Fifth Amendment, 2025
- Dated 16 Sep 2026Madhya Pradesh Electricity Supply Code, 2021 — Sixth Amendment, 2026
Commencement notices and reasons
- Dated 16 Sep 2026MP Gazette Notification dated 18-SEP-2026
Other copies of these documents (1)
- Dated 26 Jun 2024Madhya Pradesh Electricity Supply Code 2021 — Fourth Amendment, 2024
8 more documents belong here and are not on Voltaic: 7 copies in another language and 1 commencement notice or statement of reasons.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.