Conditions of Supply of Electricity of Distribution Licensees in Karnataka — Fourth Amendment, 2016

Conditions of Supply of Electricity of Distribution Licensees in the State of Karnataka (CoS), (Fourth Amendment) 2016

AmendmentDated 25 Jan 2016No: KERC/CoS/D/13/15-16 dated 25.1.2016

Amends the Conditions of Supply of Electricity of Distribution Licensees in the State of Karnataka, 2006 — with First and Second Amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Karnataka Electricity Regulatory Commission's Fourth Amendment to the Conditions of Supply of Electricity of Distribution Licensees in the State of Karnataka, issued as Notification No. KERC/CoS/D/13/15-16 dated 25 January 2016 (p1). The preamble records that the original Conditions of Supply were gazetted on 17 June 2006 and amended by the first, second and third amendments of 20 March 2008, 22 July 2010 and 26 August 2014, and that a draft fourth amendment dated 9 December 2015 was published for objections, placed on the Commission's website and newspapers, and followed by a public hearing (p1).

Clause 1 names the instrument as the Conditions of Supply of Electricity of Distribution Licensees in the State of Karnataka (CoS), (Fourth Amendment) 2016; it applies to all licensees engaged in distribution of electricity and to consumers in Karnataka, and it comes into force from the date of publication in the official Gazette of Karnataka, though the Gazette date itself is not printed (p1).

Clause 2 substitutes specified existing clauses of the CoS with amended text through a two-column table (pp3–4). The amendments deal with LT installations: installations with electronic trivector meters or static meters having maximum-demand recording and demand-based tariff; connection of additional load and the consumer's duty to inform the licensee about additional machinery; penal tariff where recorded maximum demand exceeds sanctioned load, by reference to the relevant Tariff Order; and the applicability of the KERC (Recovery of expenditure for supply of electricity) Regulations, 2004 for certain load or built-up-area thresholds (p3).

The table also rewrites Clause 42.00/42.01 on unauthorized increase in load for LT installations. It distinguishes installations that have opted for demand-based tariff, other installations, and existing installations where an electromechanical or non-MD static meter is replaced by an electronic trivector or MD-recording meter. It specifies two-times-tariff penal charges for extra recorded demand, treatment of the first month and subsequent months after meter replacement, a twelve-month limitation where the unauthorized-use period cannot be ascertained, and regularization under clause 42.01(v) (pp3–4).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, Theft and unauthorised use, Metering

Read with this

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document