KERC · Karnataka Electricity Regulatory Commission
Conditions of Supply of Electricity of Distribution Licensees in Karnataka — Fourth Amendment, 2016
Conditions of Supply of Electricity of Distribution Licensees in the State of Karnataka (CoS), (Fourth Amendment) 2016
AmendmentDated 25 Jan 2016No: KERC/CoS/D/13/15-16 dated 25.1.2016
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Karnataka Electricity Regulatory Commission's Fourth Amendment to the Conditions of Supply of Electricity of Distribution Licensees in the State of Karnataka, issued as Notification No. KERC/CoS/D/13/15-16 dated 25 January 2016 (p1). The preamble records that the original Conditions of Supply were gazetted on 17 June 2006 and amended by the first, second and third amendments of 20 March 2008, 22 July 2010 and 26 August 2014, and that a draft fourth amendment dated 9 December 2015 was published for objections, placed on the Commission's website and newspapers, and followed by a public hearing (p1).
Clause 1 names the instrument as the Conditions of Supply of Electricity of Distribution Licensees in the State of Karnataka (CoS), (Fourth Amendment) 2016; it applies to all licensees engaged in distribution of electricity and to consumers in Karnataka, and it comes into force from the date of publication in the official Gazette of Karnataka, though the Gazette date itself is not printed (p1).
Clause 2 substitutes specified existing clauses of the CoS with amended text through a two-column table (pp3–4). The amendments deal with LT installations: installations with electronic trivector meters or static meters having maximum-demand recording and demand-based tariff; connection of additional load and the consumer's duty to inform the licensee about additional machinery; penal tariff where recorded maximum demand exceeds sanctioned load, by reference to the relevant Tariff Order; and the applicability of the KERC (Recovery of expenditure for supply of electricity) Regulations, 2004 for certain load or built-up-area thresholds (p3).
The table also rewrites Clause 42.00/42.01 on unauthorized increase in load for LT installations. It distinguishes installations that have opted for demand-based tariff, other installations, and existing installations where an electromechanical or non-MD static meter is replaced by an electronic trivector or MD-recording meter. It specifies two-times-tariff penal charges for extra recorded demand, treatment of the first month and subsequent months after meter replacement, a twelve-month limitation where the unauthorized-use period cannot be ascertained, and regularization under clause 42.01(v) (pp3–4).
Read with this
The regulation
Amendments and corrections
- Dated 14 Mar 2008Conditions of Supply of Electricity of the Distribution Licensees in Karnataka, 2006 — First Amendment, 2008
- Dated 1 Jul 2010Conditions of Supply of Electricity of Distribution Licensees in Karnataka — Second Amendment, 2010
- Dated 25 Aug 2014Karnataka Conditions of Supply of Electricity, 2006 — Third Amendment, 2014
- Dated 22 Nov 2016Conditions of Supply of Electricity of Distribution Licensees in Karnataka (CoS), 2006 — Fifth Amendment, 2016
- Dated 27 Dec 2017Conditions of Supply of Electricity of Distribution Licensees in Karnataka (CoS), 2006 — Sixth Amendment, 2017
- Dated 26 Dec 2018Conditions of Supply of Electricity of Distribution Licensees in Karnataka (Seventh Amendment), 2018
- Dated 22 Oct 2019Conditions of Supply of Electricity of Distribution Licensees in Karnataka, 2006 — Eighth Amendment, 2019
- Dated 1 Jul 2022Conditions of Supply of Electricity of Distribution Licensees in Karnataka (CoS), 2006 — Tenth Amendment, 2022
Procedures and orders made under it
- Dated 17 Jun 2025Order on 110 kV contract demand limit and HT-to-LT conversion, 2025
3 more documents belong here and are not on Voltaic: 3 copies in another language.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.