Skip to content

KERC · Karnataka Electricity Regulatory Commission

Conditions of Supply of Electricity of Distribution Licensees in Karnataka (CoS), 2006 — Sixth Amendment, 2017

Conditions of Supply of Electricity of Distribution Licensees in the State of Karnataka (CoS) (Sixth Amendment), 2017

AmendmentDated 27 Dec 2017KERC/CoS/D/2/17-18 dated 27.12. 2017

Amends the Conditions of Supply of Electricity of Distribution Licensees in the State of Karnataka, 2006 — with First and Second Amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Sixth Amendment, 2017, to the KERC Conditions of Supply of Electricity of Distribution Licensees in the State of Karnataka (CoS), issued on 27.12.2017 under Section 16 of the Electricity Act, 2003 read with Condition 7.3 of the KERC (Conditions of Licence for the ESCOMs) Regulations, 2004 (p1). It amends the CoS originally gazetted on 17 June 2006, and follows five earlier amendments made between 2008 and 2016 (p1). The Commission explains that the Additional Chief Secretary, Energy Department, MESCOM and KASSIA sought changes to certain clauses; two draft amendments were published for objections in June and July 2017, and a public hearing was held on 07.09.2017 (p1).

The amendment takes effect from 1 February 2018 and applies to all distribution licensees and to electricity consumers in Karnataka (p1). Its operative content is a table that substitutes or inserts individual clauses of the CoS (p1–6): the documents required with an application for supply or additional supply, including occupancy proof, partnership/company papers, trade licence and solar water heater undertaking (p1–2); the requirement to name the Licensed Electrical Contractor in the application, with an exemption for domestic and commercial loads below 7.5 kW (p3); the contractor's completion-cum-test report and wiring diagram (p3); self-execution of 11 kV/LT lines and transformers in industrial layouts, supervision and maintenance charges, and the bar on recovery of supply expenditure (p3); building-plan and occupancy-certificate requirements where sanctioned plans are missing, with deletion of one sub-para (p3–5); general conditions for distribution transformer capacity, referencing CEA technical standards (p4); street-lighting provisions, including energy-efficient lamp requirements and payment timelines (p5); the officers authorised to sign power supply agreements, by installation category (p6); and conversion from one type of use to another (change of tariff category) (p6).

A transitional clause (clause 3) governs which applications are processed under the amended CoS: those registered on or after 01.02.2018, and those registered earlier for which power sanction had not yet been communicated, follow the amended conditions; applications registered before 01.02.2018 for which sanction was already communicated follow the pre-amendment CoS (p6).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Supply to buildings and colonies

Read with this

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document