Skip to content

KERC · Karnataka Electricity Regulatory Commission

Conditions of Supply of Electricity of the Distribution Licensees in Karnataka, 2006 — First Amendment, 2008

First amendment to the Conditions of Supply of Electricity of the Distribution Licensees in the State of Karnataka

AmendmentDated 14 Mar 2008Published in the Gazette 20 Mar 2008K.E.R.C. /COS/D/07/08 dated 14.3.2008

Amends the Conditions of Supply of Electricity of Distribution Licensees in the State of Karnataka, 2006 — with First and Second Amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Karnataka Electricity Regulatory Commission's First Amendment to the Conditions of Supply of Electricity of the Distribution Licensees in the State of Karnataka (Notification No. K.E.R.C. /COS/D/07/08 dated 14.3.2008, Gazette pp. 1371–1380, 20 March 2008) revises specific clauses of the parent Conditions of Supply notified on 17 June 2006. It responds to BESCOM's representation of 25 October 2007 about implementation difficulties, to the Ministry of Power's amendment to the Electricity Act 2003 dated 13 June 2007, and to the Karnataka Government's replacement of the Appellate Authority notification of 7 February 2005 by a notification dated 22 May 2007. Draft amendments were circulated and nine responses, including from BESCOM and HESCOM, were considered (p1).

The operative part is a clause-wise substitution table running from p2 to p9. It amends service-connection and metering rules: when HT and LT supply are provided to the same premises, whether separate service mains from a single source with a common isolation point are allowed, underground-cable requirements for named ESCOM areas, the height and ground-floor location of metering space, with an exception for existing installations, and the rounding of fractional loads (p2–3). It changes agreement and load rules: the initial agreement period for HT installations, the HT agreement renewal clause, reduction of contract demand/sanctioned load for LT and IP-set installations, and conversion from HT to LT, including the eligibility threshold for LT conversion (p3–4).

The amendment also revises enforcement and dispute provisions: penal charges for excess maximum demand, unauthorised increase of connected/rated load, unauthorised extension of supply and unauthorised use; back-billing for unauthorised irrigation-pump connections; procedures and time limits for objecting to provisional assessment; the deposit precondition for appealing an assessment order; and the designation of Appellate Authorities by ESCOM and assessment amount, following the 22 May 2007 state notification (p5–9).

It extends to the whole of Karnataka and applies to all distribution licensees under section 14 of the Electricity Act 2003 and their consumers. It comes into force from the date of publication in the Karnataka official gazette and remains in force unless amended otherwise (p1).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Metering

Read with this

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document