Conditions of Supply of Electricity of the Distribution Licensees in the State of Karnataka

RegulationDated 17 Jun 2006Published in the Gazette 17 Jun 2006EN 27 PSR 205 dated 17.6.2006

9 amendments to it are on Voltaic, the latest dated 1 Jul 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software, from pages 1 to 33 of 137. Check the regulator's original before you rely on it.

This is the Karnataka Electricity Regulatory Commission’s consolidated Conditions of Supply of Electricity for distribution licensees, notified in the Karnataka Gazette on 17 June 2006. It applies across Karnataka to every distribution licensee and to consumers (p5–6). The remaining parts are mapped from the contents list (p1, p3–4).

The cover and preamble (p1–5) set out the legal background: the Commission formulated the conditions using Section 16 of the Electricity Act 2003 and the Karnataka Electricity Reform Act 1999, after the ESCOMs failed to furnish a draft under the KERC (Conditions of Licence to ESCOMs) Regulations, 2004. The notification number is EN 27 PSR 205. The text records two later amendments — a First Amendment notified 14 March 2008 and published 20 March 2008, and a Second Amendment notified 1 July 2010 and published 22 July 2010 (p1). The cover also lists eleven annexures reprinting related KERC regulations, the Electricity Supply Code, power supply agreements, indemnity bonds and a Government of Karnataka notification on Special Courts (p1).

Chapter I gives the short title, state-wide extent, application to licensees and consumers, and commencement from Gazette publication (p5–6). Chapter II defines 65 terms used throughout, including voltage bands, load concepts, metering point and unauthorised use, and says the Electricity Act 2003 prevails over the KER Act 1999 on inconsistency (p6–12). Chapter III declares standard LT, HT and EHT voltages and classifies supply by sanctioned load/contract demand and voltage, with a contract-demand-to-voltage table and notes on augmentation and Railways two-phase traction supply (p13–15).

Chapter IV is the general connection procedure: application and documents; power sanction and estimates; service main and service line; inspection and testing; approval of consumer installations; commencement of supply; and general conditions such as load limiters, harmonics, child-labour undertakings and solar water heating undertakings (p16–27). Clauses 5.00–12.00 then set category-specific procedures. Clause 5 covers domestic lighting, AEH and commercial lighting, including an 8-day Tatkal scheme with surcharge, and government schemes like Bhagyajyoti and Kuteerajyoti (p27–28). Clause 6 covers irrigation pump sets, including metering, water-right proof, capacitor requirements and priority (p28–30). Clause 7 covers LT industrial and commercial installations, including trivector metering and TOD tariff (p30). Clause 8 covers HT/EHT installations, including service-line completion, switchgear, metering and TOD tariff (p30–32). Clause 9 begins the separate regime for commercial/residential buildings, complexes and multi-storeyed buildings above stated load or built-up-area thresholds, covering documents, transformer space, deposits and cellular telecommunication services (p32–33).

The contents list (p3–4) shows the rest of the regulation: Chapter V on wiring and maintenance, access, testing and failure of supply; Chapter VI on power factor; Chapter VII on metering and billing, payment, disconnection and adjustment of bills; Chapter VIII on the schedule of charges; Chapter IX on rating, agreements, minimum charges, load variation, shifting/transfer, restrictions, resale and change of tariff category; Chapter X on prejudicial use, unauthorised load, misuse, theft, compounding and provisional assessment; Chapter XI on appeals; and Chapter XII on written decisions, reservation of rights and repeal and savings. The annexures at pp86–132 reproduce related KERC regulations and forms.

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Metering

Read with this

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of KERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document