KERC · Karnataka Electricity Regulatory Commission
Conditions of Supply of Electricity of Distribution Licensees in the State of Karnataka, 2006 — with First and Second Amendments
Conditions of Supply of Electricity of the Distribution Licensees in the State of Karnataka
RegulationDated 17 Jun 2006Published in the Gazette 17 Jun 2006EN 27 PSR 205 dated 17.6.2006
9 amendments to it are on Voltaic, the latest dated 1 Jul 2022.
Summary
Summary written by software, from pages 1 to 33 of 137. Check the regulator's original before you rely on it.
This is the Karnataka Electricity Regulatory Commission’s consolidated Conditions of Supply of Electricity for distribution licensees, notified in the Karnataka Gazette on 17 June 2006. It applies across Karnataka to every distribution licensee and to consumers (p5–6). The remaining parts are mapped from the contents list (p1, p3–4).
The cover and preamble (p1–5) set out the legal background: the Commission formulated the conditions using Section 16 of the Electricity Act 2003 and the Karnataka Electricity Reform Act 1999, after the ESCOMs failed to furnish a draft under the KERC (Conditions of Licence to ESCOMs) Regulations, 2004. The notification number is EN 27 PSR 205. The text records two later amendments — a First Amendment notified 14 March 2008 and published 20 March 2008, and a Second Amendment notified 1 July 2010 and published 22 July 2010 (p1). The cover also lists eleven annexures reprinting related KERC regulations, the Electricity Supply Code, power supply agreements, indemnity bonds and a Government of Karnataka notification on Special Courts (p1).
Chapter I gives the short title, state-wide extent, application to licensees and consumers, and commencement from Gazette publication (p5–6). Chapter II defines 65 terms used throughout, including voltage bands, load concepts, metering point and unauthorised use, and says the Electricity Act 2003 prevails over the KER Act 1999 on inconsistency (p6–12). Chapter III declares standard LT, HT and EHT voltages and classifies supply by sanctioned load/contract demand and voltage, with a contract-demand-to-voltage table and notes on augmentation and Railways two-phase traction supply (p13–15).
Chapter IV is the general connection procedure: application and documents; power sanction and estimates; service main and service line; inspection and testing; approval of consumer installations; commencement of supply; and general conditions such as load limiters, harmonics, child-labour undertakings and solar water heating undertakings (p16–27). Clauses 5.00–12.00 then set category-specific procedures. Clause 5 covers domestic lighting, AEH and commercial lighting, including an 8-day Tatkal scheme with surcharge, and government schemes like Bhagyajyoti and Kuteerajyoti (p27–28). Clause 6 covers irrigation pump sets, including metering, water-right proof, capacitor requirements and priority (p28–30). Clause 7 covers LT industrial and commercial installations, including trivector metering and TOD tariff (p30). Clause 8 covers HT/EHT installations, including service-line completion, switchgear, metering and TOD tariff (p30–32). Clause 9 begins the separate regime for commercial/residential buildings, complexes and multi-storeyed buildings above stated load or built-up-area thresholds, covering documents, transformer space, deposits and cellular telecommunication services (p32–33).
The contents list (p3–4) shows the rest of the regulation: Chapter V on wiring and maintenance, access, testing and failure of supply; Chapter VI on power factor; Chapter VII on metering and billing, payment, disconnection and adjustment of bills; Chapter VIII on the schedule of charges; Chapter IX on rating, agreements, minimum charges, load variation, shifting/transfer, restrictions, resale and change of tariff category; Chapter X on prejudicial use, unauthorised load, misuse, theft, compounding and provisional assessment; Chapter XI on appeals; and Chapter XII on written decisions, reservation of rights and repeal and savings. The annexures at pp86–132 reproduce related KERC regulations and forms.
Read with this
Amendments and corrections
- Dated 14 Mar 2008Conditions of Supply of Electricity of the Distribution Licensees in Karnataka, 2006 — First Amendment, 2008
- Dated 1 Jul 2010Conditions of Supply of Electricity of Distribution Licensees in Karnataka — Second Amendment, 2010
- Dated 25 Aug 2014Karnataka Conditions of Supply of Electricity, 2006 — Third Amendment, 2014
- Dated 25 Jan 2016Conditions of Supply of Electricity of Distribution Licensees in Karnataka — Fourth Amendment, 2016
- Dated 22 Nov 2016Conditions of Supply of Electricity of Distribution Licensees in Karnataka (CoS), 2006 — Fifth Amendment, 2016
- Dated 27 Dec 2017Conditions of Supply of Electricity of Distribution Licensees in Karnataka (CoS), 2006 — Sixth Amendment, 2017
- Dated 26 Dec 2018Conditions of Supply of Electricity of Distribution Licensees in Karnataka (Seventh Amendment), 2018
- Dated 22 Oct 2019Conditions of Supply of Electricity of Distribution Licensees in Karnataka, 2006 — Eighth Amendment, 2019
- Dated 1 Jul 2022Conditions of Supply of Electricity of Distribution Licensees in Karnataka (CoS), 2006 — Tenth Amendment, 2022
Procedures and orders made under it
- Dated 17 Jun 2025Order on 110 kV contract demand limit and HT-to-LT conversion, 2025
3 more documents belong here and are not on Voltaic: 3 copies in another language.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of KERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.