Order on 110 kV contract demand limit and HT-to-LT conversion, 2025

In the matter of: 1. Increasing the limit of contract demand (CD) up to 55 MVA from the current limit of 35 MVA under 110 KV supply voltage. 2. Conversion from one type of use to another type of use (Change in tariff Category).

OrderDated 17 Jun 2025

Made under the Conditions of Supply of Electricity of Distribution Licensees in the State of Karnataka, 2006 — with First and Second Amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

KERC disposes of two issues through a removal-of-difficulties order dated 17.06.2025 (p1). First, an EHT consumer asked to take 110 kV supply with contract demand above the 35 MVA limit in the Conditions of Supply, and KPTCL sought clarification on sanctioning load beyond 35 MVA on a 110 kV line (p1). Second, at public hearings consumers complained that distribution licensees were forcing new equipment for HT-to-LT conversion instead of allowing existing consumer-installed distribution transformers and LT lines to be reused (p1).

The Commission accepts both. Operatively, it raises the 110 kV contract demand limit to 55 MVA from 35 MVA, subject to technical feasibility — voltage regulation, KPTCL substation power transformer capacity, energy losses, and line loading within thermal rating. For CD above 35 MVA up to 55 MVA, augmentation charges are ₹10 lakhs per MVA (p2). On HT-to-LT conversion, existing distribution transformers, LT service lines and associated equipment/materials installed by the consumer at his cost during HT supply may be used for the LT connection (p2). The Commission directs its office to propose amendments to the relevant CoS/KERC Regulation clauses through the prescribed procedure (p2). No gazette publication or independent commencement date is stated.

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Connection and miscellaneous charges

Read with this

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document