KERC · Karnataka Electricity Regulatory Commission

Conditions of Supply of Electricity of Distribution Licensees in Karnataka (CoS), 2006 — Fifth Amendment, 2016

Conditions of Supply of Electricity of Distribution Licensees in the State of Karnataka (CoS) (Fifth Amendment), 2016

AmendmentDated 22 Nov 2016No. KERC/CoS/D/2/16-17 dated 22.11.2016

Amends the Conditions of Supply of Electricity of Distribution Licensees in the State of Karnataka, 2006 — with First and Second Amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

KERC's Fifth Amendment to the Conditions of Supply of Electricity of Distribution Licensees in the State of Karnataka, 2006 (CoS), issued as Notification No. KERC/CoS/D/2/16-17 dated 22.11.2016 (p1). The preamble records that the principal CoS were notified in the Karnataka Gazette on 17 June 2006 and had already been amended four times; a draft Fifth Amendment was notified on 30.06.2016, hosted on the Commission's website and published in newspapers, and a public hearing was held on 19.10.2016 (p1). The Commission makes the amendment under Section 16 of the Electricity Act, 2003 read with Condition 7.3 of the KERC (Conditions of Licence for the ESCOMs) Regulations, 2004 (p1).

Clause 1 gives the short title and commencement: it applies to all distribution licensees and consumers in Karnataka and comes into force from the date of publication in the official Gazette (p2); no Gazette date is printed. The operative part is a substitution table: existing clauses in the CoS are replaced by amended text (p2). The amendments cover clause 7.03 on industrial layouts developed by KIADB/KSSIDC/KEONICS/others, including self-execution work, supervision charges, maintenance charges and recovery of expenditure (pp2-3); a new clause 7.06 allowing LT industrial consumers to share power with tenants through sub-meters on a no-profit-no-loss basis (p2); clause 8.14 on HT/EHT consumers using power within premises and letting parts to residential, commercial or industrial tenants with sub-metering (pp2-3); clause 9.07 on alternate source of supply arrangements (p3); a bulk check meter provision (item 10) for energy audit (p4); clause 9.11 on loading of distribution transformers with diversity factors (p4); clause 12.01 on temporary LT and HT supply, including application, fees, service charges and work execution (pp4-6); and clause 36.00 on transfer of installations / change of consumer name, with documents, consent, indemnity, arrears and fees (pp6-7).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Connection and miscellaneous charges

Read with this

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗