Conditions of Supply of Electricity of Distribution Licensees in Karnataka, 2006 — Eighth Amendment, 2019
Conditions of Supply of Electricity of Distribution Licensees in the State of Karnataka (Eighth Amendment), 2019
AmendmentDated 22 Oct 2019KERC/CoS/DDD/1/2018-19/908 dated 22.10.2019
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a short, single-clause amendment by the Karnataka Electricity Regulatory Commission inserting a new clause 9A.00 into the Conditions of Supply of Electricity of Distribution Licensees in the State of Karnataka, 2006 (p2). The trigger, as the Preamble explains (p1), was a BESCOM request backed by the Karnataka Electric Vehicle & Energy Storage Policy 2017 for dedicated and mandatory EV charging points at the parking space of high-rise buildings, shopping malls, apartment complexes and similar buildings; the Commission found the request acceptable in the larger interest of protecting the environment.
The Preamble (p1) recites the original 2006 notification in the Karnataka Gazette, seven subsequent amendments, the draft Eighth Amendment published in the State Gazette on 29.11.2018 with an invitation for public objections, the objections received from BESCOM, CESC and KASSIA, and a public hearing scheduled for 08.03.2019 at which no one appeared. Clause 1 (p1–2) gives the short title and commencement — from the date of publication in the Official Gazette — limits the amendment to buildings whose power sanctions are made thereafter, and states that it applies to all distribution licensees and electricity consumers in the State.
Clause 2 (p2) is the operative provision: it fixes the class of buildings to which the new obligation attaches — commercial or residential buildings, complexes and M.S. buildings in metropolitan areas, Urban Development Authority areas of all cities and city corporation areas — by reference to a requisitioned load threshold or a built-up area threshold, and requires owners, promoters or occupiers of such buildings to provide at least two charging points capable of charging electric vehicles, with adequate space.
Read with this
The regulation
Amendments and corrections
- Dated 14 Mar 2008Conditions of Supply of Electricity of the Distribution Licensees in Karnataka, 2006 — First Amendment, 2008
- Dated 1 Jul 2010Conditions of Supply of Electricity of Distribution Licensees in Karnataka — Second Amendment, 2010
- Dated 25 Aug 2014Karnataka Conditions of Supply of Electricity, 2006 — Third Amendment, 2014
- Dated 25 Jan 2016Conditions of Supply of Electricity of Distribution Licensees in Karnataka — Fourth Amendment, 2016
- Dated 22 Nov 2016Conditions of Supply of Electricity of Distribution Licensees in Karnataka (CoS), 2006 — Fifth Amendment, 2016
- Dated 27 Dec 2017Conditions of Supply of Electricity of Distribution Licensees in Karnataka (CoS), 2006 — Sixth Amendment, 2017
- Dated 26 Dec 2018Conditions of Supply of Electricity of Distribution Licensees in Karnataka (Seventh Amendment), 2018
- Dated 1 Jul 2022Conditions of Supply of Electricity of Distribution Licensees in Karnataka (CoS), 2006 — Tenth Amendment, 2022
Procedures and orders made under it
- Dated 17 Jun 2025Order on 110 kV contract demand limit and HT-to-LT conversion, 2025
3 more documents belong here and are not on Voltaic: 3 copies in another language.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.