KERC · Karnataka Electricity Regulatory Commission
Karnataka Conditions of Supply of Electricity, 2006 — Third Amendment, 2014
Third amendment to the various Clauses of Conditions of Supply of Electricity of the Distribution Licensees in the State of Karnataka, 2006
AmendmentDated 25 Aug 2014KERC/CoS/D/13/14-15 dated 25" August, 2014
Summary
Summary written by software. Check the regulator's original before you rely on it.
KERC's Third Amendment to the Conditions of Supply of Electricity of Distribution Licensees in the State of Karnataka (CoS), 2006, issued as Notification No. KERC/CoS/D/13/14-15 dated 25 August 2014 (p1). It is a short, operative amendment: it rewrites four CoS clauses governing how distribution licensees handle consumer applications, temporary supply and time-of-day tariff, and it extends to the whole State and binds every licensee distributing electricity under s.14 of the Electricity Act 2003 and their consumers (p1). The notification is already issued; it comes into force on publication in the Karnataka Gazette, but no Gazette date is printed (p1).
The preamble sets the background: the CoS was notified on 17 June 2006 and amended twice, on 20 March 2008 and 22 July 2010; BESCOM, GESCOM and consumers raised implementation difficulties; and the mandatory ToD tariff imposed on HT 2(a) and HT 2(b) installations by the Tariff Order of 30 April 2012 had to be written into the CoS. Draft amendments were published on 20 February 2014 for objections, followed by a public hearing on 4 July 2014 and an ESCOM meeting on 14 July 2014 (p1).
The amendments themselves sit in a two-column substitution table (p2). Clause 4.03(iv) is recast to impose a penalty on the licensee for failing to arrange power supply within the stipulated time, to allow one renewal of a lapsed power-sanction application against re-registration cum processing charges under Clause 30.01, and to lay down differentiated timelines and extension rights — with cancellation of the application and forfeiture of charges for defaulting applicants (p2). Clause 8.13 changes the ToD facility from an option for eligible categories to one extended as specified by the Commission in its orders (p2). Clause 9.00's applicability thresholds for commercial/residential buildings, complexes and M.S. buildings are raised from 25 kW to 35 kW of requisitioned load and from 500 to 800 square metres of built-up area (p2). Clause 12.04(ii)(b) regularises temporary supply for permanent use in special circumstances, caps it at two years from date of service, and requires Clause 9.12 compliance for buildings taller than 15 metres (p2).
Read with this
The regulation
Amendments and corrections
- Dated 14 Mar 2008Conditions of Supply of Electricity of the Distribution Licensees in Karnataka, 2006 — First Amendment, 2008
- Dated 1 Jul 2010Conditions of Supply of Electricity of Distribution Licensees in Karnataka — Second Amendment, 2010
- Dated 25 Jan 2016Conditions of Supply of Electricity of Distribution Licensees in Karnataka — Fourth Amendment, 2016
- Dated 22 Nov 2016Conditions of Supply of Electricity of Distribution Licensees in Karnataka (CoS), 2006 — Fifth Amendment, 2016
- Dated 27 Dec 2017Conditions of Supply of Electricity of Distribution Licensees in Karnataka (CoS), 2006 — Sixth Amendment, 2017
- Dated 26 Dec 2018Conditions of Supply of Electricity of Distribution Licensees in Karnataka (Seventh Amendment), 2018
- Dated 22 Oct 2019Conditions of Supply of Electricity of Distribution Licensees in Karnataka, 2006 — Eighth Amendment, 2019
- Dated 1 Jul 2022Conditions of Supply of Electricity of Distribution Licensees in Karnataka (CoS), 2006 — Tenth Amendment, 2022
Procedures and orders made under it
- Dated 17 Jun 2025Order on 110 kV contract demand limit and HT-to-LT conversion, 2025
3 more documents belong here and are not on Voltaic: 3 copies in another language.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.