TSERC · Telangana State Electricity Regulatory Commission
Terms and Conditions of Open Access Regulation, 2024 — First Amendment, 2026
Telangana Electricity Regulatory Commission (First Amendment to Regulation 1 of 2024 being Terms and Conditions of Open Access Regulation, 2024), Regulation, 2026
Amendment · Gazette copyDated 24 Jan 2026Published in the Gazette 3 Feb 2026No. TGERC/secy/D.No: 65/2026,- dated 24-01-2026
The Gazette copy of the Terms and Conditions of Open Access Regulation, 2024 — First Amendment, 2026.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Telangana Electricity Regulatory Commission's first amendment to its 2024 open access regulation, published in the Telangana Gazette of 3 February 2026 and taking effect on that date (p1–2). The recitals on p1 explain the trigger: clause 33.5 of the principal regulation (TGERC Regulation No. 1 of 2024, notified 18.03.2024) issued renewable energy certificates for the unutilised banked quantum to the green energy open access consumer; NLDC clarified that RECs should go to the generator for surplus energy injected in the month, so TGSLDC asked the Commission to amend, also citing clause 7.2(e) of the CERC Procedure for Implementation of REC Mechanism, 2024 dated 07.03.2024 (p1).
On p2 the operative part does two things. Clause 2 rewrites clause 14.11 of the principal regulation — how energy injected into the licensee's network between grant of green energy open access and submission of the wheeling agreement is treated: no payment of energy charges to the applicant, and the energy is treated as inadvertent power. Clause 3 substitutes the proviso to clause 33.5 so that a renewable energy generating station, rather than the consumer, is entitled to RECs to that extent.
Clause 1 gives the short title, extends the regulation to the whole of Telangana and fixes commencement on gazette publication. The order is signed by the Commission Secretary at Hyderabad on 24-01-2026 (p2).
Read with this
The regulation
- Dated 15 Mar 2024Terms and Conditions of Open Access Regulation, 2024
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
- Dated 30 Nov 2024Procedure of verification of status of CGP, 2024
Proposed changes (drafts with no final yet)
- Released with the notice dated 30 Sep 2024Draft Procedure for Verification of Captive Status of Generating Plants in Telangana
- Dated 30 Sep 2024Public notice: Draft Procedure for Verification of Captive Status of Generating Plants in Telangana — Public Notice
Earlier drafts
- Dated 15 Nov 2025Terms and Conditions of Open Access Regulations, 2024 — First Amendment, 2025 — Draft
- Dated 15 Nov 2025Public notice: Terms and Conditions of Open Access Regulation, 2024 — First Amendment — Public Notice — Draft
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.