Draft Procedure for Verification of Captive Status of Generating Plants in Telangana — Public Notice

Draft Procedure for verification of Captive Status of such Generating Plants, where Captive Generating Plant and its Captive User(s) are located in Telangana State

Public notice on a draftDated 30 Sep 2024

Draft

Voltaic holds no final regulation made from this draft.

Public notice on the draft Procedure for Verification of Captive Status of Generating Plants in Telangana.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tgerc.telangana.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

TGERC has issued a one-page public notice (p1) announcing a draft procedure for verifying the captive status of generating plants where both the captive generating plant and its captive user(s) are located in Telangana. The Commission states it makes the draft under s.181(1) of the Electricity Act 2003 and gives the draft's full title, but does not reproduce its text — instead directing readers to the Commission's website (p1).

The notice's operative content is procedural: it invites objections and suggestions from all stakeholders, including the general public, to be sent by post or by e-mail to the Commission Secretary (p1). The date that matters to a reader is the comment deadline, 21.09.2024 (p1); the notice itself is signed by the Commission Secretary and dated 30/9/2024 (p1).

Nothing here sets out the verification criteria, forms, fees or evidentiary requirements — those would sit in the draft procedure itself, which is not part of this document.

Standard name
Captive Generation Regulations
Primary topics
Captive status

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Procedures and orders made under it

Other copies of these documents (1)

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tgerc.telangana.gov.in ↗

Report an issue with this document