Skip to content

TSERC · Telangana State Electricity Regulatory Commission

Terms and Conditions of Open Access Regulation, 2024 — Statement of Reasons

In the matter of (Terms and Conditions of Open Access) Regulation, 2024 STATEMENT OF REASONS

Statement of reasonsDated 15 Mar 2024

The commission's reasons for the Terms and Conditions of Open Access Regulation, 2024 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tgerc.telangana.gov.in ↗

Summary

Summary written by software, from pages 1 to 26 of 51. Check the regulator's original before you rely on it.

The document is the Statement of Reasons (SoR) of the Telangana State Electricity Regulatory Commission for the TSERC (Terms and Conditions of Open Access) Regulation, 2024, dated 15.03.2024 (p1). It is an explanatory record, not the operative regulation: it explains why the Commission accepted or rejected stakeholder comments on the draft regulation posted on the Commission's website on 02.09.2023 (p2). The background traces the continuing application of erstwhile APERC open access and balancing/settlement regulations through TSERC (Adoption) Regulation No.1 of 2014, and notes that MoP's Electricity (Promoting Renewable Energy Through Green Energy open access) Rules, 2022 required the Commission to align its open access regulations (p1). Thirty stakeholders submitted written comments; Annexure-I lists them (p2). The clause numbers in the SoR are those of the draft regulation (p2).

The SoR then works through the draft regulation clause by clause. Paragraph 1 deals with a request to extend the comment deadline (p2). Paragraph 2 covers definitions (pp2-6): the Commission retains definitions such as banking, captive user, entry point, losses and working day; modifies the Green Energy Open Access Consumer definition; renames Open Access Consumer and Scheduled Consumer as Full Open Access Consumer and Partial Open Access Consumer; modifies Open Access Generator and Open Access User definitions; rejects a new installed capacity definition and a new banking cycle definition; and removes the phrase 'under the Open Access Regulation' from definitions (pp2-6).

Paragraph 3 recasts the categorisation clause, replacing the four user categories with classification by system, entry/exit location and duration - long-term, medium-term and short-term - and removes the separate green energy category (pp6-8). Paragraph 4 replaces 'Nodal Agency' with 'State Nodal Agency' or 'SNA' and describes SLDC's role for short-term open access and the Green Energy Open Access Registry (pp8-9). Paragraph 5 retains the short-term open access criteria based on inherent design margins, unutilised capacity and spare capacity (p9).

Paragraph 6 deals with verification of captive generating plants and captive users (pp9-14). It specifies annual verification by the distribution licensee, the consumption and equity shareholding criteria, methods for co-located and separately located plants, security deposit by bank guarantee, and consequences of losing captive status. Following the Electricity (Third Amendment) Rules, 2023, inter-state captive status is to be verified by the Central Electricity Authority; the distribution licensee's submission to the Commission is moved to 30 June (pp12-14).

Paragraph 7 addresses existing users other than distribution licensees, allowing continuation under existing agreements but treating additional capacity or renewal as a new application (pp14-15). Paragraph 8 covers capacities for allowing open access, including the eligibility thresholds for open access and green energy open access and the phased treatment of smaller consumers (pp15-16). Paragraph 9 sets the priority for capacity allotment: distribution licensee first, then long-term, medium-term and short-term applicants, with procedures for congestion and capital contribution (pp16-18). Paragraph 10 clarifies application and processing fees as including applicable taxes (p18).

Paragraphs 11 to 13 cover the application procedures for long-term, medium-term and short-term open access (pp19-22). The Commission removes the old calendar-month window, adjusts timelines, and introduces deemed approval provisions. Paragraph 14 sets out the Green Energy Open Access procedure from the zero date, including acknowledgement, system studies, concurrence, grant, agreement submission, bank guarantee for long-term/medium-term GEOA, payment for energy injected before agreement, and commissioning timelines; the Commission retains the draft clauses despite stakeholder objections (pp22-25). Paragraph 15 retains the day-ahead GEOA transaction fee (p25). Paragraph 16 revises the open access agreement provisions to include entry points and to allow bipartite, tripartite or multipartite agreements; failure to approach licensees within 30 working days can cancel the approval (pp25-26).

Standard name
Open Access Regulations
Primary topics
Open access, Green energy open access, Open access charges

Read with this

The regulation

Amendments and corrections

Procedures and orders made under it

Other copies of these documents (1)

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tgerc.telangana.gov.in ↗

Report an issue with this document