TSERC · Telangana State Electricity Regulatory Commission
Terms and Conditions of Open Access Regulation, 2024 — Statement of Reasons
In the matter of (Terms and Conditions of Open Access) Regulation, 2024 STATEMENT OF REASONS
Statement of reasonsDated 15 Mar 2024
The commission's reasons for the Terms and Conditions of Open Access Regulation, 2024 or one of its amendments.
Summary
Summary written by software, from pages 1 to 26 of 51. Check the regulator's original before you rely on it.
The document is the Statement of Reasons (SoR) of the Telangana State Electricity Regulatory Commission for the TSERC (Terms and Conditions of Open Access) Regulation, 2024, dated 15.03.2024 (p1). It is an explanatory record, not the operative regulation: it explains why the Commission accepted or rejected stakeholder comments on the draft regulation posted on the Commission's website on 02.09.2023 (p2). The background traces the continuing application of erstwhile APERC open access and balancing/settlement regulations through TSERC (Adoption) Regulation No.1 of 2014, and notes that MoP's Electricity (Promoting Renewable Energy Through Green Energy open access) Rules, 2022 required the Commission to align its open access regulations (p1). Thirty stakeholders submitted written comments; Annexure-I lists them (p2). The clause numbers in the SoR are those of the draft regulation (p2).
The SoR then works through the draft regulation clause by clause. Paragraph 1 deals with a request to extend the comment deadline (p2). Paragraph 2 covers definitions (pp2-6): the Commission retains definitions such as banking, captive user, entry point, losses and working day; modifies the Green Energy Open Access Consumer definition; renames Open Access Consumer and Scheduled Consumer as Full Open Access Consumer and Partial Open Access Consumer; modifies Open Access Generator and Open Access User definitions; rejects a new installed capacity definition and a new banking cycle definition; and removes the phrase 'under the Open Access Regulation' from definitions (pp2-6).
Paragraph 3 recasts the categorisation clause, replacing the four user categories with classification by system, entry/exit location and duration - long-term, medium-term and short-term - and removes the separate green energy category (pp6-8). Paragraph 4 replaces 'Nodal Agency' with 'State Nodal Agency' or 'SNA' and describes SLDC's role for short-term open access and the Green Energy Open Access Registry (pp8-9). Paragraph 5 retains the short-term open access criteria based on inherent design margins, unutilised capacity and spare capacity (p9).
Paragraph 6 deals with verification of captive generating plants and captive users (pp9-14). It specifies annual verification by the distribution licensee, the consumption and equity shareholding criteria, methods for co-located and separately located plants, security deposit by bank guarantee, and consequences of losing captive status. Following the Electricity (Third Amendment) Rules, 2023, inter-state captive status is to be verified by the Central Electricity Authority; the distribution licensee's submission to the Commission is moved to 30 June (pp12-14).
Paragraph 7 addresses existing users other than distribution licensees, allowing continuation under existing agreements but treating additional capacity or renewal as a new application (pp14-15). Paragraph 8 covers capacities for allowing open access, including the eligibility thresholds for open access and green energy open access and the phased treatment of smaller consumers (pp15-16). Paragraph 9 sets the priority for capacity allotment: distribution licensee first, then long-term, medium-term and short-term applicants, with procedures for congestion and capital contribution (pp16-18). Paragraph 10 clarifies application and processing fees as including applicable taxes (p18).
Paragraphs 11 to 13 cover the application procedures for long-term, medium-term and short-term open access (pp19-22). The Commission removes the old calendar-month window, adjusts timelines, and introduces deemed approval provisions. Paragraph 14 sets out the Green Energy Open Access procedure from the zero date, including acknowledgement, system studies, concurrence, grant, agreement submission, bank guarantee for long-term/medium-term GEOA, payment for energy injected before agreement, and commissioning timelines; the Commission retains the draft clauses despite stakeholder objections (pp22-25). Paragraph 15 retains the day-ahead GEOA transaction fee (p25). Paragraph 16 revises the open access agreement provisions to include entry points and to allow bipartite, tripartite or multipartite agreements; failure to approach licensees within 30 working days can cancel the approval (pp25-26).
Read with this
The regulation
- Dated 15 Mar 2024Terms and Conditions of Open Access Regulation, 2024
Amendments and corrections
Procedures and orders made under it
- Dated 30 Nov 2024Procedure of verification of status of CGP, 2024
Other copies of these documents (1)
Proposed changes (drafts with no final yet)
- Released with the notice dated 30 Sep 2024Draft Procedure for Verification of Captive Status of Generating Plants in Telangana
- Dated 30 Sep 2024Public notice: Draft Procedure for Verification of Captive Status of Generating Plants in Telangana — Public Notice
Earlier drafts
- Dated 15 Nov 2025Terms and Conditions of Open Access Regulations, 2024 — First Amendment, 2025 — Draft
- Dated 15 Nov 2025Public notice: Terms and Conditions of Open Access Regulation, 2024 — First Amendment — Public Notice — Draft
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.