TSERC · Telangana State Electricity Regulatory Commission
Terms and Conditions of Open Access Regulation, 2024 — First Amendment, 2026
Telangana Electricity Regulatory Commission (First Amendment to Regulation 1 of 2024 being Terms and Conditions of Open Access Regulation, 2024), Regulation, 2026
AmendmentDated 24 Jan 2026No: TGERC/Secy/D.No: 65/2026 dated 24.01.2026
Amends the Terms and Conditions of Open Access Regulation, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
A two-page amendment by the Telangana Electricity Regulatory Commission to its 2024 open access regulation. The recitals (p1) give the trigger: NLDC clarified that RECs for surplus/unutilised energy injected in a month are issued to the green energy open access generator, and TGSLDC asked the Commission to amend Regulation 1 of 2024 accordingly, aligning with clause 7.2(e) of the CERC "Procedure for Implementation of REC Mechanism 2024" (p1).
The operative text has three clauses (p2). Clause 1 gives the short title, extends the regulation to the whole of Telangana and brings it into force on Gazette publication. Clause 2 rewrites clause 14.11 of the Principal Regulation so that energy injected into the licensee's network between grant of GEOA and submission of the wheeling agreement is treated as inadvertent power, earning the applicant no energy charges. Clause 3 rewrites the proviso to clause 33.5 so that the Renewable Energy Generating Station, not the GEOA consumer, is entitled to RECs for the unutilised banked quantum. There are no tables or annexures.
Read with this
The regulation
- Dated 15 Mar 2024Terms and Conditions of Open Access Regulation, 2024
Commencement notices and reasons
Procedures and orders made under it
- Dated 30 Nov 2024Procedure of verification of status of CGP, 2024
Other copies of these documents (1)
Proposed changes (drafts with no final yet)
- Released with the notice dated 30 Sep 2024Draft Procedure for Verification of Captive Status of Generating Plants in Telangana
- Dated 30 Sep 2024Public notice: Draft Procedure for Verification of Captive Status of Generating Plants in Telangana — Public Notice
Earlier drafts
- Dated 15 Nov 2025Terms and Conditions of Open Access Regulations, 2024 — First Amendment, 2025 — Draft
- Dated 15 Nov 2025Public notice: Terms and Conditions of Open Access Regulation, 2024 — First Amendment — Public Notice — Draft
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.