TSERC · Telangana State Electricity Regulatory Commission
Terms and Conditions of Open Access Regulations, 2024 — First Amendment, 2025 — Draft
Telangana Electricity Regulatory Commission (First Amendment to Regulation 1 of 2024 being Terms and Conditions of Open Access Regulation, 2024), Regulation, 2025
Draft amendmentDated 15 Nov 2025
Draft
A proposal that has since been finalised as the Terms and Conditions of Open Access Regulation, 2024 — First Amendment, 2026.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is a two-page draft amendment by the Telangana Electricity Regulatory Commission to its 2024 open access regulation. Its recitals explain that the principal regulation, TGERC Regulation No.1 of 2024, was notified on 18 March 2024; that clause 33.5 provides renewable energy certificates (RECs) to green energy open access (GEOA) consumers for unutilised banked energy; and that, after an NLDC clarification on RECs for unutilised or surplus energy injected by GEOA generators, TGSLDC asked the Commission to amend the regulation. The draft also cites clause 7.2(e) of the CERC Procedure for Implementation of REC Mechanism 2024 dated 7 March 2024 (p1).
Clause 1 names the instrument as the Telangana Electricity Regulatory Commission (First Amendment to Regulation 1 of 2024 being Terms and Conditions of Open Access Regulation, 2024), Regulation, 2025; extends it to the whole of Telangana; and says it comes into force on publication in the Telangana Gazette (p1–2).
Clause 2 modifies clause 14.11 of the principal regulation. It provides that energy injected into the licensee's network from the date of grant of GEOA until the date of submission of the wheeling agreement is not eligible for payment of energy charges and is treated as inadvertent power (p2).
Clause 3 modifies clause 33.5. It adds a proviso that a renewable energy generating station is entitled to RECs to that extent, shifting the REC entitlement for the unutilised banked quantum from the GEOA consumer to the generating station (p2). The draft is signed by the Commission Secretary and dated 15 November 2025 at Hyderabad (p2).
Read with this
The regulation
- Dated 15 Mar 2024Terms and Conditions of Open Access Regulation, 2024
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
- Dated 30 Nov 2024Procedure of verification of status of CGP, 2024
Other copies of these documents (1)
Proposed changes (drafts with no final yet)
- Released with the notice dated 30 Sep 2024Draft Procedure for Verification of Captive Status of Generating Plants in Telangana
- Dated 30 Sep 2024Public notice: Draft Procedure for Verification of Captive Status of Generating Plants in Telangana — Public Notice
Earlier drafts
- Dated 15 Nov 2025Public notice: Terms and Conditions of Open Access Regulation, 2024 — First Amendment — Public Notice — Draft
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.