Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Distribution Standards of Performance Regulations, 2004 — Amendment, 2013

Amendment to TAMIL NADU ELECTRICITY DISTRIBUTION STANDARDS OF PERFORMANCE REGULATIONS Notification No. TNERC/SPR/9/1-10 / Dated 14.8.2013

AmendmentDated 14 Aug 2013Published in the Gazette 23 Oct 2013TNERC/SPR/9/1-10 dated 14.8.2013

Amends the Tamil Nadu Electricity Distribution Standards of Performance Regulations, 2004.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a TNERC notification amending the Tamil Nadu Electricity Distribution Standards of Performance Regulations, 2004. It was issued on 14.8.2013 under s.181(2)(za) of the Electricity Act 2003 after the draft was published under s.181(3), and takes effect on the date of Gazette publication — the issue carrying it is dated 23 October 2013 (p1–2).

The operative part makes three changes. First, a proviso is added to regulation 14 specifying the permissible band of voltage variation at the consumer's point of commencement of supply, measured over a minimum continuous period, and conditioned on grid supply voltage being within its own permissible limits (p2). Second, regulation 15 on Voltage Complaints is replaced: on a voltage-fluctuation complaint the licensee must first verify whether the limits in regulation 14 are exceeded and, if confirmed, carry out rectification on a time schedule keyed to the type of work involved (p3). Third, the compensation Table in regulation 21 gains new entries after item 5 covering failure to rectify voltage complaints within those periods, with a per-day compensation subject to a stated maximum (p3–4).

The tail of the document is explanatory rather than operative: an Explanatory Statement (p5) explaining that the 2004 Regulations fixed no permissible voltage limits and that the Commission proposes to specify limits, rectification timelines and compensation; and a side-by-side Statement of existing and amended provisions (pp6–9) covering regulations 14, 15 and 21, including the declared supply voltages to which the limits apply and the new compensation rows.

Standard name
Standards of Performance
Primary topics
Standards of performance, Power quality

Read with this

Consolidated copies, for reference (2)

9 more documents belong here and are not on Voltaic: 9 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document