Tamil Nadu Electricity Distribution Standards of Performance Regulations, 2004 — consolidated as amended up to 31.7.2008

Tamil Nadu Electricity Regulatory Commission - Tamil Nadu Electricity Distribution Standards of Performance Regulations 2004

Consolidated copyDated 31 Jul 2008TNERC/SPR/9/1-9 dated 31.7.2008

A consolidated copy of the Tamil Nadu Electricity Distribution Standards of Performance Regulations, 2004, published by TNERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Tamil Nadu Electricity Regulatory Commission's consolidated re-publication of the Tamil Nadu Electricity Distribution Standards of Performance Regulations, 2004 as amended up to 31 July 2008. The opening notification (p1) lists the earlier DSOP notifications from 2004 to 2007 and says the Commission is re-publishing them with amendments incorporated so the public has an up-to-date text. The operative regulations follow at pp2–22; footnotes record what each amendment changed and its effective date, while the main body shows the amended text.

Chapter I (pp2–3) gives the short title and commencement. The regulations generally commence from Gazette publication, but regulations 21 and 22 — compensation and its payment procedure — commence one year later. The definitions clause adopts the Electricity Act 2003 and the Commission.

Chapter II (pp4–19) is the substantive code. Regulations 3–17 set service standards and time limits for quality of service; duty to supply on request, with schedules for LT and HT/EHT new connections and additional loads (pp4–6); exceptions for agricultural and hut services (p6); temporary supply (pp6–7); shifting of service connection/lines/equipment and transfer of connection (pp7–8); change of tariff (p8); billing complaints (p8); meter replacement (p8); restoration of supply after interruptions, with different restoration times for urban, rural and hill/municipal areas (pp9–10); quality-of-supply complaints and voltage complaints (p11); equipment failure (p12); and responses to written consumer complaints (p12). Regulations 18–20 cover appointments, grievance-handling arrangements and complaint registration/handling, including complaint registers, unique numbers, acknowledgment slips and escalation (pp13–15).

Regulations 21–23 create the compensation regime and performance targets: the table of events and compensation amounts (p16), automatic payment through the next bill or payment on consumer claim (p17), and targeted overall performance levels for specified service areas (p17). Regulation 24 requires licensees to report performance and compensation data every six months in the prescribed format (p18), and the Annexure (p22) gives that reporting format. Regulation 25 prescribes SAIFI and SAIDI reliability indices and the computation method, excluding feeders serving predominantly agricultural loads, with the Commission to notify annual targets (pp18–19).

Regulations 26–29 (pp19–21) require the DSOP to be read with the Supply Code, Distribution Code and Grid Code, make the Commission the final interpreter, allow suspension/relaxation during force majeure and grid failure, provide for removal of difficulties, and preserve consumer rights under other laws including the Consumer Protection Act 1986. The document is therefore a distribution-licensee service-performance rulebook and consumer compensation scheme for Tamil Nadu.

Standard name
Standards of Performance
Primary topics
Standards of performance, New connections and load changes, Consumer grievance redressal (CGRF)

Read with this

Consolidated copies, for reference (1)

9 more documents belong here and are not on Voltaic: 9 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document