Tamil Nadu Electricity Distribution Standards of Performance Regulations — enforcement mechanism extension order, 2007

Order No. 1/2007/TNERC/D(E)/AD/SA/SPR dated 3.10.2007

OrderDated 3 Oct 2007Order No. 1/2007/TNERC/D(E)/AD/SA/SPR dated 3.10.2007

Made under the Tamil Nadu Electricity Distribution Standards of Performance Regulations, 2004.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is TNERC's order of 3 October 2007 disposing of a TNEB request to further defer the enforcement mechanism of the Tamil Nadu Electricity Distribution Standards of Performance Regulations (p1). It is a history-and-decision order, not the text of the Regulations themselves.

Paragraphs 1–3 set the baseline: the Regulations were published in the Tamil Nadu Government Gazette on 1.9.2004, with everything except Regulations 21 and 22 in force from that date; Regulation 21 (compensation payable by licensees for failure to meet standards) and Regulation 22 (procedure for paying it) were deliberately deferred by one year under Regulation 1(iii), so they took effect on 1.9.2005 (p1).

Paragraphs 4–7 recount the extensions the Commission granted TNEB on successive representations — nine months to 31.5.2006, six months to 30.11.2006, then the 12.12.2006 notification that brought the mechanism into force on 1.1.2007 for a first set of service areas (new, additional and temporary supply, shifting and transfer of connections, tariff change, billing complaints, meter replacement, complaint handling, appointments and grievance handling) while allowing a further seven months to 30.6.2007 for interruption of supply and voltage complaints and for named Table I / Table II items of Regulation 4 (p2–3). A 14.6.2007 TNEB request for a year's postponement produced only a short extension to 31.7.2007 for those same items (p3).

Paragraphs 8–9 reject TNEB's letter of 20.8.2007 seeking a six-month freeze for new service connections: for LT Table I(a) and HT/EHT Table II(a) the mechanism had already been in force since 1.1.2007 and the request came too late; enforcement for all items took effect on 1.8.2007, with the order hosted on the website on 9.7.2007 (p4).

Standard name
Standards of Performance
Primary topics
Standards of performance, New connections and load changes, Power quality

Read with this

Consolidated copies, for reference (2)

9 more documents belong here and are not on Voltaic: 9 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document