Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Distribution Standards of Performance Regulations, 2004 — Draft Amendment

Amendment to TAMIL NADU ELECTRICITY DISTRIBUTION STANDARDS OF PERFORMANCE REGULATIONS

Draft amendmentDated 20 Feb 2013

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a TNERC consultation paper: a draft set of amendments to the Tamil Nadu Electricity Distribution Standards of Performance Regulations 2004, published under section 181(3) of the Electricity Act 2003 so that affected persons can object or suggest changes (p1). The covering notice states that the draft will be taken up on or after fifteen days from its publication on the Commission's website, and gives the Secretary's Chennai address for objections in duplicate (p1). No notification number or date is printed.

The operative text on p2 makes three changes. First, it adds a proviso to regulation 14 under which, where grid supply voltage is within permissible limits, the distribution licensee must keep voltage variation at the consumer's point of commencement of supply within stated bands of the declared voltage, measured over a minimum of seven continuous days; the bands are set out in a small table (p2). Second, it substitutes regulation 15 with a new "Voltage Complaints" provision: on a complaint the licensee must first check whether the fluctuation exceeds the regulation 14 limits and, if confirmed, carry out rectification to a time schedule (p3). Third, it inserts new items after item 5 of the Table in regulation 21, attaching a per-day compensation amount to each day of default, graded by the kind of works involved — no expansion or enhancement of network, LT upgradation or transformer/capacitor installation, and HT upgradation (p3).

The substance therefore is voltage-quality obligation, complaint handling and consumer compensation for delay, all grafted onto the existing 2004 standards-of-performance framework (p2-3).

Standard name
Standards of Performance
Primary topics
Power quality, Standards of performance

Read with this

Consolidated copies, for reference (2)

9 more documents belong here and are not on Voltaic: 9 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document