TNERC · Tamil Nadu Electricity Regulatory Commission

Distribution Standards of Performance Regulations, 2004 — Amendment, 2023

Amendments To Distribution Standards of Performance Regulations, 2004

AmendmentDated 26 Dec 2023Published in the Gazette 21 Feb 2024TNERC / DSOP / SPR 9 / 1-13 dated 26.12.2023

Amends the Tamil Nadu Electricity Distribution Standards of Performance Regulations, 2004.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the TNERC notification amending the Tamil Nadu Electricity Distribution Standards of Performance Regulations, 2004, published in the Tamil Nadu Government Gazette of 21 February 2024 (p1–2). It is dated 26.12.2023 and takes effect from the date of gazette publication (p2). The text runs as a single amendment notification, followed by an Explanatory Statement (pp9–10) and an Annexure that reproduces the old and new text of each regulation side by side (pp10–21).

Regulation 2 gains definitions of two reliability indices, SAIDI and SAIFI, with the existing residual clause renumbered (p2). Regulation 4 is replaced to set out the licensee's duty to supply on request, with separate time schedules for LT and HT/EHT connections, additional demand, and the advice-slip and remittance-of-charges cycle (pp3–4). Regulation 6 is replaced to simplify temporary supply, covering conversion to permanent supply, prepayment metering and refund or transfer of deposits (p4). Regulation 9 covers change of tariff, change of consumer particulars and dynamic and permanent reduction of demand (pp4–5). Regulation 11 shortens the deadline for replacing defective or burnt meters, and Regulation 12 adds a restoration-of-supply duty after disconnection (p5).

The core of the operative change is consumer compensation. Regulation 21 is replaced with a new compensation table keyed to events — new connection, additional demand, temporary supply, shifting, name transfer, tariff change, disconnection, billing, reconnection, meter replacement, interruption, voltage complaints, grievance handling, temporary-supply deposit refunds and grid-interactive solar timelines (pp5–6). Regulation 22 sets the procedure: automatic compensation for remotely monitorable parameters, claim-based compensation otherwise, an online claim facility to be created within six months, and adjustment of compensation against bills (pp6–7). Regulation 24 mandates six-monthly performance reporting, a 24x7 toll-free call centre and CRM system, outage intimation to consumers, GIS-based asset and consumer mapping, and geo-tagging of legacy assets (p7). Regulation 25 replaces the reliability regime with SAIFI/SAIDI computation for 11kV, 22kV and 33kV feeders, monthly urban and rural limits, monitoring exclusions, and publication and quarterly reporting duties (pp7–9). The Annexure heading is renamed Appendix (p9).

The Explanatory Statement says the changes incorporate the Ministry of Power's Electricity (Rights of Consumers) Rules, 2020 as amended, and that the reliability limits draw on Forum of Regulators model regulations and the Ministry of Power's consumer service rating of discoms for FY 2021-22 (pp9–10).

Standard name
Standards of Performance
Primary topics
Standards of performance, New connections and load changes, Metering

Read with this

Consolidated copies, for reference (2)

9 more documents belong here and are not on Voltaic: 9 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document