Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Distribution Standards of Performance Regulations, 2004

Tamil Nadu Electricity Regulatory Commission- Tamil Nadu Electricity Distribution Standards of Performance Regulations 2004

RegulationDated 21 Jul 2004Published in the Gazette 1 Sep 2004Notification No. TNERC/SPR/9/1 dated 21.07.2004

6 amendments to it are on Voltaic, the latest dated 26 Dec 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is TNERC's first principal regulation setting distribution standards of performance for licensees in Tamil Nadu, notified on 21.07.2004 and published in the Tamil Nadu Government Gazette of 1 September 2004 (p1). Chapter I (pp1–2) gives the short title and commencement: everything applies from gazette publication except regulations 21 and 22, which start only one year later (p2).

Chapter 2 (pp3–7) is the operative core. It defines quality of service as uninterrupted, reliable supply at stipulated voltage and frequency (reg 3), reproduces section 43 of the Electricity Act on the duty to supply on request and fixes time schedules for giving new supply where no extension works are involved and where lines must be extended or substations commissioned (regs 4–5). It carves out agricultural and hut services from the section 43 duty, leaving them to separate Commission directives following the National Electricity Policy and State Government policy directions (pp3–4). Subsequent regulations set time limits for temporary supply and refunds, shifting of meters and lines, transfer of service connection, change of tariff, billing complaints, meter replacement, restoration of supply after interruptions (with separate urban and rural schedules, night-hour rules, and priority for Railways and essential services), quality of supply, voltage complaints, equipment maintenance, written replies to consumer letters, keeping appointments, and grievance handling through registers, unique complaint numbers and acknowledgment slips (pp4–7).

The document leaves permissible voltage variation limits to be ordered by the Commission from time to time and defers frequency variation to the Grid Code (reg 14, p6). Regulations 21 and 22 (p8) create a compensation regime with two payment modes — automatic credit in the next bill and claim-based — for failures against the standards. Regulation 23 (pp8–9) sets targeted levels of performance for each service area; regulation 24 requires half-yearly reporting to the Commission under section 59 (p9); regulation 25 requires each licensee to build a reliability model using CAIFI and CAIDI and get it approved by the Commission (p9). Regulations 26–29 cover reading with the Supply, Distribution and Grid Codes, severability, force majeure and general relaxation, removal of difficulties, and savings for consumer rights under the Consumer Protection Act 1986 (pp9–10). An Annexure (p11) gives the format for reporting performance and compensation paid.

Standard name
Standards of Performance
Primary topics
Standards of performance, New connections and load changes, Power quality

Read with this

Consolidated copies, for reference (2)

9 more documents belong here and are not on Voltaic: 9 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of TNERC's website on 29 Sep 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document