Commencement noticeDated 13 Dec 2006Published in the Gazette 3 Jan 2007TNERC/SPR/9/1- 5 dated 13.12.2006

Commencement notice for the Tamil Nadu Electricity Distribution Standards of Performance Regulations, 2004 or one of its amendments. The dates are in the notice.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a Tamil Nadu Electricity Regulatory Commission order, gazetted on 3 January 2007 (p1) and notified on 13 December 2006, that fixes when the compensation machinery of the 2004 Distribution Standards of Performance Regulations actually starts to bite.

The recitals (pp2–5) trace the history. The Regulations were gazetted on 1 September 2004 and everything except Regulations 21 and 22 came into force then; Regulation 21 sets the compensation payable by the licensee for failing to meet a standard and Regulation 22 the procedure for paying it, and Regulation 1(iii) deferred those two by a year (p2). Two further deferrals followed — nine months, to 1 June 2006, and six months, to 1 December 2006, each notified separately and each conditional (p3). TNEB then wrote on 7 November 2006 asking for a year's further postponement and made a presentation on 4 December 2006 (pp3–4). The Commission holds that the difficulties pleaded are "incessant", notes TNEB's improved level of performance, and concludes that compensation can be implemented in most cases from 1 January 2007 (pp4–5).

Operatively (pp6–7), Regulations 21 and 22 come into force from 1 January 2007 for six listed service areas: the duty to give supply on request, complaints in billing, replacement of meters, responding to consumers' complaints, making and keeping appointments, and grievance handling; within Regulation 4 enforcement is confined to Table I item (a) and Table II item (a). Enforcement is postponed to 30 June 2007 for interruption of supply and for voltage fluctuations and complaints, with exemption up to the same date for the extension-and-improvement, transformer and new-substation items of Regulation 4 (pp6–7).

Standard name
Standards of Performance
Primary topics
Standards of performance, New connections and load changes, Power quality

Read with this

Consolidated copies, for reference (2)

9 more documents belong here and are not on Voltaic: 9 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document