This is a Tamil Nadu Electricity Regulatory Commission consultation paper: a draft set of amendments to the 2004 Distribution Standards of Performance Regulations, published with comments invited by 26.05.2023 (p1). The Commission says it will take the draft up after thirty days from publication on its website, and sets out where objections are to be sent (p1). Nine numbered amendments follow.
Amendment 1 rewrites regulation 4, the licensee's duty to supply on request, laying down the application-to-supply time schedule — LT in Table I and HT/EHT in Table II — from cases needing no extension through transformer addition to new substations, together with the advice-slip and remittance cycle, the exclusion of applicant-caused delay and the extension of the schedule to additional loads (p2–4). Amendment 2 rewrites regulation 6 on temporary supply: a fixed outer limit for service, compulsory pre-payment meters conforming to the CEA meter regulations, and refund or transfer of balance deposits (p4–5). Amendment 3 adds demand-reduction obligations after regulation 9; Amendment 4 replaces regulation 11 with a meter-replacement deadline and bars meter shortage as an excuse for delayed restoration; Amendment 5 adds a restoration deadline to regulation 12 (p5). Amendment 6 substitutes the regulation 21 compensation table of events and amounts (p6–7). Amendment 7 rewrites regulation 22 with the compensation procedure: automatic payment for remotely monitored parameters, claim-based compensation through a designated employee or an online portal, a remote-monitoring requirement and an online claim facility, and adjustment against bills (p7–8). Amendment 8 adds call-centre and CRM-system obligations to regulation 24 (p8–9). Amendment 9 replaces regulation 25 on service reliability — SAIFI/SAIDI definitions and formulae, monthly urban/rural limits, exclusions for momentary, force-majeure and grid-operator outages, counting of planned outages, data capture from monitoring systems, circle-wise reporting to the Commission, a 24x7 supply obligation and the possibility of a reliability charge (p9–12).
An explanatory statement (p13–14) ties the changes to the Ministry of Power's Electricity (Rights of Consumers) Rules, 2020. The Annexure (p15–27) is a regulation-by-regulation comparative statement of existing and proposed text.
Read with this
The regulation
Amendments and corrections
- Dated 31 Aug 2005Tamil Nadu Electricity Distribution Standards of Performance — Postponement of Enforcement Mechanism to 1.6.2006, 2005
- Dated 25 Jul 2006Tamil Nadu Electricity Distribution Standards of Performance (Amendment) Regulations, 2006
- Dated 2 May 2007Distribution Standards of Performance (First Amendment) Regulations, 2007
- Dated 14 Aug 2013Tamil Nadu Electricity Distribution Standards of Performance Regulations, 2004 — Amendment, 2013
- Dated 30 Jun 2015Tamil Nadu Electricity Distribution Standards of Performance Regulations, 2004 — Amendment, 2015
- Dated 26 Dec 2023Distribution Standards of Performance Regulations, 2004 — Amendment, 2023
Commencement notices and reasons
Procedures and orders made under it
Consolidated copies, for reference (2)
Earlier drafts
- Dated 20 Feb 2013Tamil Nadu Electricity Distribution Standards of Performance Regulations, 2004 — Draft Amendment
- Dated 12 Mar 2014Tamil Nadu Distribution Standards of Performance Regulations, 2004 — Draft Amendment to Regulation 22
- Dated 25 Nov 2019Tamil Nadu Electricity Distribution Standards of Performance Regulations, 2004 — Draft Amendment, 2019
9 more documents belong here and are not on Voltaic: 9 copies in another language.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.