MERC · Maharashtra Electricity Regulatory Commission
Processing of Open Access Applications — Practice Directions under the 2016 Open Access Regulations
PROCESSING OF OPEN ACCESS APPLICATIONS
ProcedureDated 8 Mar 2017
Made under the Transmission Open Access Regulations, 2016.
Summary
Summary written by software. Check the regulator's original before you rely on it.
These Practice Directions are the Maharashtra Electricity Regulatory Commission's response to five complaints from open access applicants about how distribution licensees were handling applications and charges (p1). They are issued under Regulation 35 of the DOA Regulations and Regulation 34 of the TOA Regulations (p5).
The preamble (p1) lists the five problems: wheeling and transmission charges levied on applied-for contract demand rather than actual drawal; charges recovered for the whole STOA period on non-utilisation, even for renewable energy; STOA capped at the consumer's metering CT/PT capacity; MTOA applications left unanswered since April 2016; and rejections on format or other procedural grounds.
Issues A–E (p1–5) set out the Commission's reading of its own regulations. On charges, Regulation 14.6 of the DOA Regulations and Regulation 14.1 of the TOA Regulations, read with the InSTS Tariff Order in Case No. 91 of 2016 and the base transmission tariff formula in the MYT Regulations, mean charges are payable on actual energy drawn at the consumption end on a Rs/kWh basis — not on contract demand — and the Commission quotes the licensee's own contrary formula (p3) to reject it. On non-utilisation, Regulation 11.9 must be read with Regulations 16.2 and 20.1, so it does not apply to RE. On metering, the earlier Practice Directions of 19.10.2016 already said open access is not limited to contract demand; RE banking means CT/PT augmentation is unnecessary unless metering is inadequate. On MTOA, Regulation 10.5 requires a decision with reasons within 60 days. On format rejections, the second proviso to Regulation 4.1 requires harmonious construction of old forms.
The operative directions (p5–6) fix the actual-drawal Rs/kWh basis and require refunds within a month with interest without any application; disapply Regulation 11.9 to RE with the same refund duty; rule CT/PT augmentation unnecessary unless metering is inadequate; require the licensee to clear pending MTOA applications within 15 days with reasons and warn of liability for delay; and require preliminary or procedural deficiencies to be communicated within three working days.
Read with this
The regulation
- Dated 30 Mar 2016Transmission Open Access Regulations, 2016
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
- Dated 19 Oct 2016Distribution and Transmission Open Access Practice Directions, 2016
Other copies of these documents (1)
- Dated 30 Mar 2016Transmission Open Access Regulations, 2016
Earlier drafts
- Released with the notice dated 24 Sep 2015Transmission Open Access Regulations, 2015
- Dated 24 Sep 2015Public notice: Transmission Open Access Regulations, 2015 — Public Notice inviting comments on draft
2 more documents belong here and are not on Voltaic: 1 copy in another language and 1 draft or notice on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.