MERC · Maharashtra Electricity Regulatory Commission
Transmission Open Access Regulations, 2015 — Public Notice inviting comments on draft
INVITING COMMENTS ON DRAFT MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (TRANSMISSION OPEN ACCESS) REGULATIONS, 2015
Public notice on a draftDated 24 Sep 2015Advt. No. 10 /2015-16 dated 24th September, 2015
Draft
The draft has since been finalised as the Transmission Open Access Regulations, 2016.
Public notice on the draft Transmission Open Access Regulations, 2015.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a single-page public notice from the Maharashtra Electricity Regulatory Commission announcing that a draft of the MERC (Transmission Open Access) Regulations, 2015 has been placed on the Commission's websites, www.merc.gov.in and www.mercindia.org.in, in downloadable format (p1).
The notice's purpose is consultation: it invites comments, suggestions or objections on the draft from any interested person, and gives the channels for sending them — by hand, post, e-mail or fax — to the Secretary, MERC at the Commission's Cuffe Parade, Mumbai address, with a dedicated e-mail address for this consultation (p1).
It fixes 16 October 2015 as the last date for receipt and states that all responses received by that date will be considered by the Commission (p1). The notice is dated 24 September 2015 and signed by the Secretary, giving the consultation roughly three weeks. The substantive text of the draft regulations is not part of this document, so the notice tells a reader where to look but not what the proposed open-access regime contains.
Read with this
The regulation
- Dated 30 Mar 2016Transmission Open Access Regulations, 2016
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
Other copies of these documents (1)
- Dated 30 Mar 2016Transmission Open Access Regulations, 2016
Earlier drafts
- Released with the notice dated 24 Sep 2015Transmission Open Access Regulations, 2015
2 more documents belong here and are not on Voltaic: 1 copy in another language and 1 draft or notice on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.