MERC · Maharashtra Electricity Regulatory Commission

Transmission Open Access Regulations, 2016 — First Amendment, 2019

Maharashtra Electricity Regulatory Commission (Transmission Open Access) (First Amendment) Regulations, 2019

AmendmentDated 7 Jun 2019MERC/Tech/2019/098 dated 7 June, 2019

Amends the Transmission Open Access Regulations, 2016.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the first amendment to MERC's 2016 Transmission Open Access Regulations, notified as No. MERC/Tech/2019/098 and signed on 7 June 2019 (p8, p14). It takes effect from the date of publication in the Official Gazette. The copy given here begins at page 8; pages 1–7, which would carry the statement of reasons and preamble, are absent.

Regulation 2 rewrites definitions — contract demand, gross metering for rooftop solar, the three open access duration classes and the time block (p8). Regulation 3 adds provisos capping partial open access at existing contract demand and full open access at sanctioned load, lifting that cap for renewable sourcing, and letting rooftop solar consumers take open access while solar credit is settled on gross metering (p9).

Regulation 6 is reworked for infirm power: testing and infirm power charges move to the Deviation Settlement Mechanism Regulations, 2019 once effective, with a MYT-based regime before that date and a fallback rate for stations without a Commission-determined tariff (p9–10). Regulation 7.2 restates the open access duration categories in a table (p10); Regulation 8.1 requires STOA and MTOA applications, with fees, to be processed online through a web portal to be built within three months (p10); Regulation 11.2(a) adds day-ahead open access conditions on block length, schedule uniformity and a floor relative to the day's maximum schedule, with exemptions for distribution licensees and full TOAUs (p10).

Regulation 14 gains multiplying transmission charges for repeated STOA transactions, a three-month grace window for existing STOA consumers moving to MTOA, a separate charge basis for renewable MTOA/LTOA, and a charge liability for partial open access consumers irrespective of the generator's BPTA (p11). New Regulations 14.9 and 14.10 set the priority order for adjusting an open access consumer's energy credits across sources, with pro-rata treatment within a category, and confine PF incentive/penalty to net energy supplied (p11–12).

The remaining clauses tie scheduling of non-firm renewable generation to the 2019 solar and wind forecasting regulations, require separate special energy meters for multi-unit generating stations, base intra-state energy settlement on approved losses, defer deviation accounting to the DSM Regulations, fix NPV discount-rate assumptions, extend distribution open access rules on banking and contract changes to transmission open access agreements, preserve banking for existing agreements, spare pending applicants from reapplying, and add a new power to relax (p12–14).

Standard name
Open Access Regulations
Primary topics
Open access, Open access charges, Scheduling and despatch

Read with this

The regulation

Other copies of these documents (1)

Earlier drafts

2 more documents belong here and are not on Voltaic: 1 copy in another language and 1 draft or notice on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document