Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Transmission Open Access Regulations, 2016

Maharashtra Electricity Regulatory Commission (Transmission Open Access) Regulations, 2016

RegulationDated 30 Mar 2016No./MERC/Tech/Open Access Transmission/Regulations/........ dated 30 March, 2016

1 amendment to it is on Voltaic, dated 7 Jun 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software, from pages 1 to 46 of 63. Check the regulator's original before you rely on it.

The Maharashtra Electricity Regulatory Commission (Transmission Open Access) Regulations, 2016 are the Commission's principal framework for granting connectivity to and open access over the intra-State transmission system in Maharashtra. They apply to generating companies, eligible consumers, distribution licensees and trading licensees, with captive generators and renewable energy generators treated as specific cases. The Regulations commence from publication in the Official Gazette; the printed signature date is 30 March 2016 (p43), but the Gazette date itself is not printed.

Part A (pp3–8) sets the short title, applicability and commencement, defines the main terms, and lists who may seek open access. It also treats existing transmission users as deemed Transmission System Users and describes transmission capacity rights. Part B (pp8–12) deals with connectivity: eligibility (consumer load or generating station capacity of 5 MW or more, with exceptions including sub-5 MW stations where technically feasible and dedicated EHV feeders), application fees, STU processing, the tripartite Connection Agreement, testing and infirm power, and timelines for the STU's decision.

Part C (pp12–28) is the application and approval machinery. It categorises open access as long-term, medium-term and short-term; designates the STU as nodal agency for connectivity, LTOA and MTOA, and the MSLDC for STOA; specifies application forms, documents, charges and the nodal-agency table for different injection/drawal locations; and sets out procedures for LTOA (including bank guarantee and system augmentation), MTOA and STOA, including advance and day-ahead STOA and congestion bidding. It also covers consent from STU/MSLDC/distribution licensees and allotment priority.

Part D (pp28–30) covers transmission charges and scheduling/system operation charges, including a regulatory charge for exceeding transmission capacity rights and cross-subsidy/additional surcharge. Part E (pp30–32) addresses scheduling, metering and communication, and energy losses. Part F (pp32–33) handles imbalance and reactive energy charges. Part G (pp33–36) sets billing, collection and disbursement, late payment, default, payment security and change of injection/drawal points. Part H (pp36–37) requires the STU and MSLDC to publish prescribed information online. Part I (pp37–43) covers under- and non-utilisation, relinquishment and stranded-capacity compensation, capacity-availability computation, curtailment priority, disputes, force majeure, amendment powers and repeal/savings.

The Regulations repeal the 2014 Transmission Open Access Regulations from the date of notification, with savings for existing agreements and pending applications (pp42–43). Annexures and formats for connectivity and STOA/LTOA/MTOA applications follow from p44.

Standard name
Open Access Regulations
Primary topics
Open access, Connectivity and GNA, Open access charges

Read with this

Amendments and corrections

Other copies of these documents (1)

Earlier drafts

2 more documents belong here and are not on Voltaic: 1 copy in another language and 1 draft or notice on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of MERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document