Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Transmission Open Access Regulations, 2015

Maharashtra Electricity Regulatory Commission (Transmission Open Access) Regulations, 2015

Draft regulationReleased with the notice dated 24 Sep 2015

Draft

A proposal that has since been finalised as the Transmission Open Access Regulations, 2016.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Maharashtra Electricity Regulatory Commission (Transmission Open Access) Regulations, 2015 create a regime for connectivity to, and open access use of, the intra-State transmission system in Maharashtra. The preamble roots the Regulations in the Electricity Act, 2003 and says they apply to open access to and use of the intra-State transmission system; they come into force on publication in the Official Gazette (p3).

Part A covers title, definitions, eligibility and nodal agencies. The STU is nodal for connectivity, long-term and medium-term open access; MSLDC is nodal for short-term open access (p3–7). Part B deals with connectivity. It makes consumers and generating stations of 5 MW or more eligible, with a feasibility route for smaller generating stations and a dedicated EHV feeder route, and sets out application, processing, connection agreement, testing and infirm-power provisions (p7–11).

Part D governs categories and application procedure. It distinguishes long-term, medium-term and short-term open access by duration and sets out separate procedures for each, including bank guarantee and BPTA requirements for long-term open access, application windows for medium-term access, and advance, day-ahead and bidding routes for short-term access (p11–23). It then covers consents from STU, MSLDC and distribution licensees, and allotment priority, with distribution licensees placed highest (p23–25).

Part E sets the charging framework: transmission charges as stipulated by CERC or the Commission, an additional regulatory charge for use beyond transmission capacity rights, cross-subsidy and additional surcharge where applicable, and scheduling/system operation charges (p25–27). Part F covers scheduling, SEM/AMR metering and communication, and allocation of energy losses for inter-State and intra-State transactions (p27–30). Part G addresses imbalance and reactive energy charges by reference to the State Grid Code, distribution open access regulations, MYT regulations and renewable energy tariff orders (p29–30).

Part H covers billing, collection and disbursement, late payment surcharge, default and disconnection, letters of credit for long-term and medium-term access, and changes to injection and drawal points (p30–33). Part I requires the STU and MSLDC to publish application forms, agreements, charges, open access details, capacity, losses and transmission plans on their websites (p33–34). Part J covers under-utilisation and relinquishment, including stranded-capacity compensation; computation of available capacity; curtailment priority; disputes; force majeure; amendment powers; and repeal and savings of the 2014 Regulations (p34–40). Annexures I–III provide connectivity and long-term/medium-term application forms, while Annexure II contains short-term forms ST1–ST4, approval, payment schedule and bidding formats (p41–61).

Standard name
Open Access Regulations
Primary topics
Open access, Connectivity and GNA, Open access charges

Read with this

The regulation

Amendments and corrections

Other copies of these documents (1)

Earlier drafts

2 more documents belong here and are not on Voltaic: 1 copy in another language and 1 draft or notice on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document