MERC · Maharashtra Electricity Regulatory Commission
Transmission Open Access Regulations, 2015
Maharashtra Electricity Regulatory Commission (Transmission Open Access) Regulations, 2015
Draft regulationReleased with the notice dated 24 Sep 2015
Draft
A proposal that has since been finalised as the Transmission Open Access Regulations, 2016.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Maharashtra Electricity Regulatory Commission (Transmission Open Access) Regulations, 2015 create a regime for connectivity to, and open access use of, the intra-State transmission system in Maharashtra. The preamble roots the Regulations in the Electricity Act, 2003 and says they apply to open access to and use of the intra-State transmission system; they come into force on publication in the Official Gazette (p3).
Part A covers title, definitions, eligibility and nodal agencies. The STU is nodal for connectivity, long-term and medium-term open access; MSLDC is nodal for short-term open access (p3–7). Part B deals with connectivity. It makes consumers and generating stations of 5 MW or more eligible, with a feasibility route for smaller generating stations and a dedicated EHV feeder route, and sets out application, processing, connection agreement, testing and infirm-power provisions (p7–11).
Part D governs categories and application procedure. It distinguishes long-term, medium-term and short-term open access by duration and sets out separate procedures for each, including bank guarantee and BPTA requirements for long-term open access, application windows for medium-term access, and advance, day-ahead and bidding routes for short-term access (p11–23). It then covers consents from STU, MSLDC and distribution licensees, and allotment priority, with distribution licensees placed highest (p23–25).
Part E sets the charging framework: transmission charges as stipulated by CERC or the Commission, an additional regulatory charge for use beyond transmission capacity rights, cross-subsidy and additional surcharge where applicable, and scheduling/system operation charges (p25–27). Part F covers scheduling, SEM/AMR metering and communication, and allocation of energy losses for inter-State and intra-State transactions (p27–30). Part G addresses imbalance and reactive energy charges by reference to the State Grid Code, distribution open access regulations, MYT regulations and renewable energy tariff orders (p29–30).
Part H covers billing, collection and disbursement, late payment surcharge, default and disconnection, letters of credit for long-term and medium-term access, and changes to injection and drawal points (p30–33). Part I requires the STU and MSLDC to publish application forms, agreements, charges, open access details, capacity, losses and transmission plans on their websites (p33–34). Part J covers under-utilisation and relinquishment, including stranded-capacity compensation; computation of available capacity; curtailment priority; disputes; force majeure; amendment powers; and repeal and savings of the 2014 Regulations (p34–40). Annexures I–III provide connectivity and long-term/medium-term application forms, while Annexure II contains short-term forms ST1–ST4, approval, payment schedule and bidding formats (p41–61).
Read with this
The regulation
- Dated 30 Mar 2016Transmission Open Access Regulations, 2016
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
Other copies of these documents (1)
- Dated 30 Mar 2016Transmission Open Access Regulations, 2016
Earlier drafts
- Dated 24 Sep 2015Public notice: Transmission Open Access Regulations, 2015 — Public Notice inviting comments on draft
2 more documents belong here and are not on Voltaic: 1 copy in another language and 1 draft or notice on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.