Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Distribution and Transmission Open Access Practice Directions, 2016

Practice Directions under MERC (Distribution Open Access) and (Transmission Open Access) Regulations, 2016 dated 19 October 2016

ProcedureDated 19 Oct 2016

Made under the Transmission Open Access Regulations, 2016.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short set of Practice Directions issued by the Maharashtra Electricity Regulatory Commission under the MERC (Distribution Open Access) Regulations, 2016 and the MERC (Transmission Open Access) Regulations, 2016, settling three recurring disputes between Open Access Applicants and Distribution Licensees.

The Preamble (p1) records the representations received: day-ahead open access for sourcing power through power exchanges, RPO compliance demanded from applicants, and open access being restricted to the consumer's contract demand. Sections 1.1–1.3 (pp1–2) set out the Commission's reading of its own regulations — that 'Day-ahead Open Access' means only an application made a day before Short-Term Open Access begins, not a particular power-exchange product; that the DOA Regulations do not let a licensee demand RPO compliance data or reject applications for want of it; and that open-access quantum is not capped at contract demand, with feasibility judged on the distribution system's capacity and any augmentation routed through the Supply Code and Standards of Performance Regulations.

The operative Practice Directions (p2) turn that reasoning into four binding instructions to Nodal Agencies, Distribution Licensees and MSLDC: follow the prescribed short-term and day-ahead procedures; clear power-exchange applications in CERC-prescribed formats with a copy to the applicant; do not reject an application because the consumer has not revised contract demand, while still verifying infrastructure and intimating augmentation in writing within the stipulated time; and do not seek RPO compliance information. No date of issue is printed in the text.

Standard name
Open Access Regulations
Primary topics
Open access, Renewable purchase obligation (RPO / RCO), Power markets and exchanges

Read with this

The regulation

Amendments and corrections

Other copies of these documents (1)

Earlier drafts

2 more documents belong here and are not on Voltaic: 1 copy in another language and 1 draft or notice on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document