MERC · Maharashtra Electricity Regulatory Commission
Distribution and Transmission Open Access Practice Directions, 2016
Practice Directions under MERC (Distribution Open Access) and (Transmission Open Access) Regulations, 2016 dated 19 October 2016
ProcedureDated 19 Oct 2016
Made under the Transmission Open Access Regulations, 2016.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a short set of Practice Directions issued by the Maharashtra Electricity Regulatory Commission under the MERC (Distribution Open Access) Regulations, 2016 and the MERC (Transmission Open Access) Regulations, 2016, settling three recurring disputes between Open Access Applicants and Distribution Licensees.
The Preamble (p1) records the representations received: day-ahead open access for sourcing power through power exchanges, RPO compliance demanded from applicants, and open access being restricted to the consumer's contract demand. Sections 1.1–1.3 (pp1–2) set out the Commission's reading of its own regulations — that 'Day-ahead Open Access' means only an application made a day before Short-Term Open Access begins, not a particular power-exchange product; that the DOA Regulations do not let a licensee demand RPO compliance data or reject applications for want of it; and that open-access quantum is not capped at contract demand, with feasibility judged on the distribution system's capacity and any augmentation routed through the Supply Code and Standards of Performance Regulations.
The operative Practice Directions (p2) turn that reasoning into four binding instructions to Nodal Agencies, Distribution Licensees and MSLDC: follow the prescribed short-term and day-ahead procedures; clear power-exchange applications in CERC-prescribed formats with a copy to the applicant; do not reject an application because the consumer has not revised contract demand, while still verifying infrastructure and intimating augmentation in writing within the stipulated time; and do not seek RPO compliance information. No date of issue is printed in the text.
Read with this
The regulation
- Dated 30 Mar 2016Transmission Open Access Regulations, 2016
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
Other copies of these documents (1)
- Dated 30 Mar 2016Transmission Open Access Regulations, 2016
Earlier drafts
- Released with the notice dated 24 Sep 2015Transmission Open Access Regulations, 2015
- Dated 24 Sep 2015Public notice: Transmission Open Access Regulations, 2015 — Public Notice inviting comments on draft
2 more documents belong here and are not on Voltaic: 1 copy in another language and 1 draft or notice on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.