Skip to content

UERC · Uttarakhand Electricity Regulatory Commission

RE Tariff Regulations, 2023 — Statement of Reasons

UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2023

Statement of reasonsDate not stated

The commission's reasons for the RE and Non-Fossil Fuel Co-generation Tariff Regulations, 2023 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software, from pages 1 to 31 of 87. Check the regulator's original before you rely on it.

The Statement of Reasons (SoR) accompanies the Uttarakhand Electricity Regulatory Commission's RE Regulations, 2023, made under s.181(2)(zd) & (zp) of the Electricity Act, 2003 for the control period FY 2023-24 to FY 2027-28 (p1). It explains why the draft regulations were finalised, records stakeholder comments and objections from a consultation ending 02.06.2023 and a public hearing on 13.06.2023, and sets out the Commission's reasoning on each issue (p1–2). It states that where the SoR and the Regulations differ, the Regulations prevail (p2). Annexures I and II list the stakeholders who commented and those who attended the hearing (p1).

The SoR is organised by regulation number. It covers the scope of application, confirming that canal-bank and canal-top solar plants by eligible government organisations are bid out and that a margin over the L-1 tariff is allowed (p2–4). It settles definitions: Captive Generating Plant (p4–5), Date of Commercial Operation with solar-specific pre-requisites and performance-ratio demonstration (p5–7), the new Deemed Generation term (p7), a merged GRPV/GSPV definition (p7–8), Group Net Metering (p8–9), and a Prosumer definition aligned with the Electricity (Rights of Consumers) Rules, 2020 (p9).

It then deals with eligibility of RE technologies, adding agro-voltaic projects to the list but deferring their tariff (p9–11); environmental clearances (p11–12); generator obligations (p12–13); sale of power, including PPA timelines and third-party rooftop arrangements (p13–16); and green energy provisions linked to the Green Open Access Rules, 2022 (p16–18). Open access is discussed with parallel operation charges and exemptions for captive/group-captive solar aligned to the Solar Policy, 2023 (p18–21).

The largest section is the RPO framework (p21–28). The final regulation adds a separate Solar RPO trajectory alongside Wind RPO, Hydro Purchase Obligation and Other RPO, and includes an Energy Storage Obligation trajectory with a minimum share from renewable sources (p22–28). The SoR also records that battery storage tariffs will be determined later when norms exist (p25).

On tariffs, the SoR confirms generic and project-specific tariff options, excludes solar, wind and small RE projects from project-specific tariffs, and discusses Renovation, Modernisation and Up-gradation and provisional tariff applications (p28–31).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Renewable purchase obligation (RPO / RCO)

Read with this

The regulation

Amendments and corrections

Proposed changes (drafts with no final yet)

8 more documents belong here and are not on Voltaic: 3 copies in another language, 3 drafts or notices on a draft and 2 drafts or notices on a draft not held as English text.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document