Skip to content

UERC · Uttarakhand Electricity Regulatory Commission

RE Tariff Regulations, 2023 — First Amendment, 2024 — Statement of Reasons

UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (First Amendment) Regulations, 2024.

Statement of reasonsDate not stated

The commission's reasons for the RE and Non-Fossil Fuel Co-generation Tariff Regulations, 2023 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Statement of Reasons accompanying the UERC First Amendment Regulations, 2024 to the 2023 RE tariff regulations. It records why the Commission revised the Renewable Purchase Obligation framework and the rooftop/small solar provisions, then reproduces the final amended text. Pages 1–2 set out the background: the Principal Regulations were notified on 26 August 2023; MoP revised the RPO trajectory on 20 October 2023; MNRE and MoP letters pushed distribution licensees to plan for renewable consumption norms and to follow consumer-rule timelines for rooftop solar. The draft amendments covered Regulation 10 (RPO) and Regulation 37 (grid-interactive rooftop and small solar PV). Pages 2–4 reproduce the draft Regulation 10, including an annual RPO trajectory table, wind/hydro/distributed/other RPO categories, eligibility dates for wind and hydro projects, the distributed-RPO multiplier where generation data is missing, and an energy storage obligation table. Pages 5–11 record stakeholder comments and the Commission’s decisions, including rejection of a separate solar or biomass RPO, rejection of Pump Storage Plants under the storage obligation, and rejection of adjusting distributed RPO against other RPO. The final Regulation 10 is then reproduced, with Wind RPO eligibility moved to projects commissioned after 31 March 2022. Pages 11–14 cover Regulation 37: comments on feasibility studies, load enhancement and infrastructure costs, followed by the final rooftop/small solar provisions on capacity caps, net-energy settlement, payment for net injection, deemed generation, augmentation, virtual net metering, and timelines for feasibility study and commissioning. Pages 14–16 record UJVN Ltd.’s request to raise the Virtual/Group Net Metering ceiling, which the Commission rejects. No date of issuance or Gazette publication is printed in the text.

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Net metering, Renewable energy tariff

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Proposed changes (drafts with no final yet)

8 more documents belong here and are not on Voltaic: 3 copies in another language, 3 drafts or notices on a draft and 2 drafts or notices on a draft not held as English text.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document