Skip to content

UERC · Uttarakhand Electricity Regulatory Commission

RE Tariff Regulations, 2023 — First Amendment, 2024

UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (First Amendment) Regulations, 2024

AmendmentDated 20 Jun 2024No. F-9(34)(i)/RG/UERC/2024/410 dated June 20, 2024

Amends the RE and Non-Fossil Fuel Co-generation Tariff Regulations, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the first amendment to the UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2023, issued by the Uttarakhand Electricity Regulatory Commission on June 20, 2024 under s.181 read with s.86(1)(e) of the Electricity Act, 2003 (p1). It replaces two regulations of the Principal Regulations in their entirety rather than tweaking them.

The first substitution rewrites Regulation 10, the Renewable Purchase Obligation framework (p1–3). It sets out year-wise minimum purchase percentages for wind RPO, hydro purchase obligation (HPO), distributed RPO, other RPO and a total, running from FY 2024-25 to FY 2029-30, and defines which projects qualify to meet each sub-category — including commissioning cut-off dates for wind and hydro, a below-10 MW size test for distributed RPO, and rules on free power from hydro projects (p2). It fixes the energy base against which the percentages apply for discoms, open access consumers and captive users, provides for set-off and carry-over between wind, hydro and other RPO, and allows a distribution licensee to count gross energy from certain net-metered solar installations toward its solar RPO (p2–3). A separate table imposes an energy storage obligation, expressed as a percentage of total consumption and rising over the same period, with 85% of stored energy required to come from renewable sources, and the stored RE energy counted toward total RPO; UREDA is made the data-keeping agency for RPO compliance (p3).

The second substitution rewrites Regulation 37 on grid-interactive rooftop and small solar PV plants (p3–5). It lays down technology-specific parameters — capital cost, O&M cost and CUF by size slab — for computing generic tariff, caps installed capacity relative to sanctioned load with an absolute ceiling, provides for net-energy settlement and for payment to the prosumer when export exceeds import, bars deemed generation, allocates augmentation cost to the licensee, opens virtual net metering to specified categories, ties timelines to the Electricity (Rights of Consumers) Rules, 2020, deems applications up to a small capacity accepted without technical feasibility study, and sets a fifteen-day window for connection agreement, metering and commissioning after the installation certificate is filed (p4–5).

The amendment takes effect from the notification date, while the new Regulation 10 applies retrospectively from 1 April 2024 (p1).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Renewable purchase obligation (RPO / RCO), Net metering

Read with this

The regulation

Amendments and corrections

Proposed changes (drafts with no final yet)

8 more documents belong here and are not on Voltaic: 3 copies in another language, 3 drafts or notices on a draft and 2 drafts or notices on a draft not held as English text.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document