UERC · Uttarakhand Electricity Regulatory Commission
Public Notice — Draft Solar Benchmark Capital Cost Review Order, FY 2025-26
Inviting Comments on draft Order on Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2025-26 and onwards till reviewed/revised by the Commission.
Public notice on a draftReleased with the draft dated 12 Jun 2025
Draft
Voltaic holds no final regulation made from this draft.
Public notice on the Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Benchmark Capital Cost Review, FY 2025-26 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a one-page public notice from the Commission's Dehradun office inviting stakeholder comments on a draft Order that reviews benchmark capital cost for solar PV, solar thermal and grid-interactive rooftop and small solar PV plants (p1). The benchmark is to apply for FY 2025-26 and onwards, until the Commission reviews or revises it (p1).
The notice records that the draft Order dated 12.06.2025 has been issued under Section 61(h) and 86(1)(e) read with Section 181(2)(zd) of the Electricity Act, 2003, and has been posted on the Commission's website (p1). It gives the consultation mechanics: comments, suggestions or objections may be sent to the Secretary by post, email or in person, to reach by 04.07.2025 (p1), and states that responses arriving after that date may not be considered when the Order is finalised (p1).
The notice contains no cost figures, technology parameters or tariff methodology itself — those sit in the draft Order on the website. Its only operative content is the deadline and the channel for participation.
Read with this
The regulation
- Dated 16 Aug 2023RE and Non-Fossil Fuel Co-generation Tariff Regulations, 2023
Amendments and corrections
- Dated 20 Jun 2024RE Tariff Regulations, 2023 — First Amendment, 2024
- Dated 27 Nov 2025RE Tariff Regulations, 2023 — Second Amendment, 2025
Commencement notices and reasons
Proposed changes (drafts with no final yet)
8 more documents belong here and are not on Voltaic: 3 copies in another language, 3 drafts or notices on a draft and 2 drafts or notices on a draft not held as English text.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.