Public Notice — Draft Solar Benchmark Capital Cost Review Order, FY 2025-26

Inviting Comments on draft Order on Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2025-26 and onwards till reviewed/revised by the Commission.

Public notice on a draftReleased with the draft dated 12 Jun 2025

Draft

Voltaic holds no final regulation made from this draft.

Public notice on the Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Benchmark Capital Cost Review, FY 2025-26 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a one-page public notice from the Commission's Dehradun office inviting stakeholder comments on a draft Order that reviews benchmark capital cost for solar PV, solar thermal and grid-interactive rooftop and small solar PV plants (p1). The benchmark is to apply for FY 2025-26 and onwards, until the Commission reviews or revises it (p1).

The notice records that the draft Order dated 12.06.2025 has been issued under Section 61(h) and 86(1)(e) read with Section 181(2)(zd) of the Electricity Act, 2003, and has been posted on the Commission's website (p1). It gives the consultation mechanics: comments, suggestions or objections may be sent to the Secretary by post, email or in person, to reach by 04.07.2025 (p1), and states that responses arriving after that date may not be considered when the Order is finalised (p1).

The notice contains no cost figures, technology parameters or tariff methodology itself — those sit in the draft Order on the website. Its only operative content is the deadline and the channel for participation.

Primary topics
Capital cost and investment

Read with this

The regulation

Amendments and corrections

8 more documents belong here and are not on Voltaic: 3 copies in another language, 3 drafts or notices on a draft and 2 drafts or notices on a draft not held as English text.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document