UERC · Uttarakhand Electricity Regulatory Commission
Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Benchmark Capital Cost Review, FY 2025-26 — Draft
Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2025-26 and onwards till reviewed/revised by the Commission.
Draft orderDated 12 Jun 2025Misc. Application No. 55 of 2025 (Suo-Motu) dated June 12, 2025
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a suo-motu draft order of the Uttarakhand Electricity Regulatory Commission (Misc. Application No. 55 of 2025) reviewing benchmark capital cost and generic tariff for solar PV, solar thermal and grid-interactive rooftop/small solar PV for FY 2025-26 and onward (p1). It records that the UERC RE Regulations, 2023 were notified under the Electricity Act, 2003 and that Regulation 12 permits annual review of benchmark capital costs while fixing a five-year control period (p1). Page 2 recaps the FY 2024-25 benchmark costs and tariffs set by the Commission’s 19.11.2024 order, states that technology and capital costs have changed, and invites stakeholder comments on the draft proposal by 04.07.2025 (p2).
Annexure-A (p3–8) sets out the proposed norms. It describes benchmark capital cost as inclusive of all capital works, financing/IDC and evacuation up to the interconnection point, and explains the annual review basis (p3). For Solar PV, it walks through module prices, duties, CPI/WPI escalation, degradation, land, civil/mounting and power-conditioning costs, then proposes a capital cost and gross/net generic tariff after accelerated depreciation (p3–5). It leaves the CUF unchanged for now and says the Commission may amend the RE Regulations after receiving actual CUF data from UPCL (p5).
For solar thermal, it proposes a benchmark capital cost and gross/net generic tariff (p6). For grid-interactive rooftop and small solar PV, it discusses net-metering policy, the cost shift from prosumer exports at generic rates versus exchange prices, and the Ministry of Power’s solar-hour rebate/non-solar-hour surcharge direction (p6–7); it compares other SERCs’ rooftop export tariffs and, noting no recent UREDA bids, proposes a uniform surplus-export tariff irrespective of subsidy (p7).
The proposed tariffs are to apply to projects commissioned on or after 01.04.2025 and continue until reviewed; they are ceilings, with procurement through competitive bidding (p8).
Read with this
The regulation
- Dated 16 Aug 2023RE and Non-Fossil Fuel Co-generation Tariff Regulations, 2023
Amendments and corrections
- Dated 20 Jun 2024RE Tariff Regulations, 2023 — First Amendment, 2024
- Dated 27 Nov 2025RE Tariff Regulations, 2023 — Second Amendment, 2025
Commencement notices and reasons
Proposed changes (drafts with no final yet)
- Released with the draft dated 12 Jun 2025Public notice: Public Notice — Draft Solar Benchmark Capital Cost Review Order, FY 2025-26
8 more documents belong here and are not on Voltaic: 3 copies in another language, 3 drafts or notices on a draft and 2 drafts or notices on a draft not held as English text.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.