UERC · Uttarakhand Electricity Regulatory Commission
RE Tariff Regulations, 2023 — Second Amendment, 2025 — Statement of Reasons
UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (Second Amendment) Regulations, 2025.
Statement of reasonsDate not stated
The commission's reasons for the RE and Non-Fossil Fuel Co-generation Tariff Regulations, 2023 or one of its amendments.
Summary
Summary written by software, from pages 1 to 33 of 35. Check the regulator's original before you rely on it.
This is UERC's Statement of Reasons accompanying the draft Second Amendment Regulations, 2025 to the UERC RE Regulations, 2023 (Principal Regulations). It records the draft amendments, the stakeholder comments received (last date 03.10.2025), the Commission's reasoning, and the final amended text of each provision, so the amendment's operative wording sits inside the SoR rather than in a separate annexure (p1–2).
Items 1–7 deal with the regulation's scope and definitions: Regulation 2 is rewritten to cover RE generating stations and BESS commissioned after these regulations, to require DISCOM identification of BESS locations via scientific study, and to allow Canal Bank, Canal Top and now ground-mounted solar plants by government organisations through competitive bidding with a 4% margin, plus a 5 paise/unit intermediary trading margin for BESS (p2–12). New definitions are inserted for BESS, Charge Ramp Rate, Cycle/Round-Trip Efficiency, Discharge Ramp Rate and BESS useful life, and the CoD definition is revised to cover solar PV (75% PR within ten days) and BESS commissioning conditions (p12–20). Regulation 4 eligibility is extended to BESS, expressly limited to standalone grid-connected systems supplying the distribution licensee (p20–21).
Items 8–12 amend tariff architecture: project-specific tariffs are barred for solar, wind, BESS and small RE projects; Regulation 12 gains scheme-wise benchmark cost/tariff determination and annual review of benchmark capital cost; depreciation, working capital and the Regulation 35 table are adjusted (p21–26). Item 13 inserts new Regulation 39.A with BESS availability formula, normative depth of discharge, cycle count and a three-month deadline for the distribution licensee, with SLDC, to submit a detailed BESS utilisation procedure for approval (p26–30). Items 14–16 insert a Regulation 53 proviso for BESS flexibility orders and revise/insert Annexure-I tables for Canal Bank/Canal Top solar and BESS levelised fixed charges (p30–31). Item 17 disposes of residual UPCL comments on scheduling, maintenance windows, VGF, ISTS/wheeling waivers and hybrid/pilot treatment (p31–33).
Read with this
The regulation
- Dated 16 Aug 2023RE and Non-Fossil Fuel Co-generation Tariff Regulations, 2023
Amendments and corrections
- Dated 20 Jun 2024RE Tariff Regulations, 2023 — First Amendment, 2024
- Dated 27 Nov 2025RE Tariff Regulations, 2023 — Second Amendment, 2025
Commencement notices and reasons
Proposed changes (drafts with no final yet)
- Dated 12 Jun 2025Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Benchmark Capital Cost Review, FY 2025-26 — Draft
- Released with the draft dated 12 Jun 2025Public notice: Public Notice — Draft Solar Benchmark Capital Cost Review Order, FY 2025-26
8 more documents belong here and are not on Voltaic: 3 copies in another language, 3 drafts or notices on a draft and 2 drafts or notices on a draft not held as English text.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.