UERC · Uttarakhand Electricity Regulatory Commission
RE Tariff Regulations, 2023 — Second Amendment, 2025
UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (Second Amendment) Regulations, 2025
AmendmentDated 27 Nov 2025No. F-9(34)(ii)/RG/UERC/2025/1329 dated November 27, 2025
Amends the RE and Non-Fossil Fuel Co-generation Tariff Regulations, 2023.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Uttarakhand Electricity Regulatory Commission's Second Amendment, 2025 to its 2023 renewable-energy tariff regulations, notified on 27 November 2025 under s.181 read with s.86(1)(e) of the Electricity Act, 2003 (p1). It comes into force on notification (p1), and its main work is to fold Battery Energy Storage Systems (BESS) into the 2023 framework while tightening procurement and tariff rules for RE generally.
The opening paragraphs give the short title and commencement and rewrite Regulation 2 on scope (p1–3). RE stations and BESS commissioned after the amendment are covered, with the DISCOM responsible for identifying BESS locations and benefits on the basis of a scientific study. Chapters 4 and 5 (tariff computation) are disapplied for stations commissioned before the amendment, except for named clauses, and their existing tariffs continue; generic tariffs for wind, solar and BESS become ceilings, with distribution licensees required to run tariff-based competitive bidding and sign PPAs with the lowest bidder. Margins are set for eligible government organisations implementing canal-bank/top and ground-mounted solar, and for an intermediary agency in BESS procurement. Existing third-party sellers may switch to supplying the DISCOM once, irrevocably, for the project's balance life (p2).
New definitions of BESS, charge ramp rate, cycle/round-trip efficiency and discharge ramp rate are inserted into Regulation 3, and the definition of date of commercial operation is rewritten with commissioning tests and proofs for small hydro, solar PV and BESS (p3–5). BESS gets its own useful life, with an extension option at a reduced tariff, and is added to the eligibility criteria under Regulation 4 (p5).
On tariffs, project-specific tariff is withdrawn for solar, wind, BESS and RE projects up to 1 MW; the control period is restated as five years from FY2023-24 with annual review of benchmark capital costs (p5). Depreciation and working-capital provisions are amended to bring BESS in (p5–6), the Regulation 35 capital-cost/O&M/CUF table and Annexure-I tables are updated, and a new Regulation 39.A sets BESS technology parameters — capital cost, O&M escalation, availability, degradation — with formulas for annual availability and provisions on depth of discharge, daily cycles and a DISCOM-filed operating procedure (p6). Regulation 53 gains a BESS-specific relaxation power, and two new tariff tables (canal solar, BESS) appear in Annexure-I (p7).
Read with this
The regulation
- Dated 16 Aug 2023RE and Non-Fossil Fuel Co-generation Tariff Regulations, 2023
Amendments and corrections
- Dated 20 Jun 2024RE Tariff Regulations, 2023 — First Amendment, 2024
Commencement notices and reasons
Proposed changes (drafts with no final yet)
- Dated 12 Jun 2025Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Benchmark Capital Cost Review, FY 2025-26 — Draft
- Released with the draft dated 12 Jun 2025Public notice: Public Notice — Draft Solar Benchmark Capital Cost Review Order, FY 2025-26
8 more documents belong here and are not on Voltaic: 3 copies in another language, 3 drafts or notices on a draft and 2 drafts or notices on a draft not held as English text.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.