PSERC · Punjab State Electricity Regulatory Commission
Supply Code Review Panel Constitution Notification, 2025
PUNJAB STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION
OrderDated 7 Aug 2025Published in the Gazette 8 Aug 2025PSERC/Secy/Regu. 196 dated The 7th August, 2025
Made under the Electricity Supply Code, Standards of Performance and Related Matters Regulations, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
PSERC notification PSERC/Secy/Regu. 196, issued 7 August 2025 and carried in the Chandigarh Gazette Extraordinary of 8 August 2025, constitutes the Supply Code Review Panel under Regulation 4(1) of the PSERC (Electricity Supply Code, Standards of Performance and Related Matters) Regulations, 2024 (p1).
It names fifteen members (p1–2): two PSERC Members, one chairing, plus the Commission Secretary and the Director/Regulations as Member-Secretary; a Power-reforms officer from the office of the Principal Secretary (Power), Government of Punjab; PSPCL's Chief Engineer/Commercial and PSTCL's Chief Engineer/TS; and non-official members drawn from industry and consumer bodies — CII Punjab, the Induction Furnace Association of North India, the Chamber of Industrial and Commercial Undertaking Ludhiana, PHD Chamber's Punjab chapter, the Consumer's Protection Federation Mohali, the SAANJH Forum and one individual member. A PSERC staff consultant sits as Permanent Invitee.
The closing paragraph does not spell out the panel's tenure, remuneration, travelling allowance or functions; it defers all of these to Regulation 4(1) and states the panel comes into being on the date of the notification (p2).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 27 Feb 2026Supply Code Review Panel Constitution Notification, 2026
- Dated 17 Mar 2026Electricity Supply Code, Standards of Performance and Related Matters, 2024 — 1st and 2nd Amendment, 2026 — Order
- Dated 25 Mar 2026Electricity Supply Code, Standards of Performance and Related Matters, 2024 — 2nd Amendment Regulations, 2026 — Order
- Dated 2 Jul 2026Electricity Supply Code, Standards of Performance and Related Matters, 2024 — 3rd Amendment, 2026 — Order
Procedures and orders made under it
Consolidated copies, for reference (1)
Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.