Skip to content

PSERC · Punjab State Electricity Regulatory Commission

Supply Code Review Panel Constitution Notification, 2026

Supply Code Review Panel 2026

NotificationDated 27 Feb 2026Published in the Gazette 2 Mar 2026PSERC/Secy/Regu. 200 dated The 27th February, 2026

Read with the Electricity Supply Code, Standards of Performance and Related Matters Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page extraordinary Gazette notification by the Punjab State Electricity Regulatory Commission, dated 27 February 2026 and printed in the Chandigarh Gazette of 2 March 2026 (p1). It constitutes the Supply Code Review Panel in terms of Regulation 4(1) of the PSERC (Electricity Supply Code, Standards of Performance and Related Matters) Regulations, 2024, and names its fourteen members (p1–2).

The panel is chaired by a Member of the Commission, with a second Member as member, and includes the Commission's Secretary, an officer of the Principal Secretary (Power), the Chief Engineers (Commercial) of PSPCL and (TS) of PSTCL, and the Commission's Director/Regulations as Member-Secretary (p1). The remaining seats go to industry associations — CII Punjab, the Induction Furnace Association of North India, the Chamber of Industrial and Commercial Undertaking, and the PHD Chamber's Punjab Power Committee — and to consumer bodies and individuals: the Consumer's Protection Federation, the SAANJH Forum for Electricity Consumer, and one named individual member (p1–2).

The notification does not restate the panel's tenure, remuneration, travelling allowance or functions; it says these are as specified in Regulation 4(1). It states that the panel comes into being on the date of the notification (p2). Nothing about meetings, quorum or reporting timelines appears here — those sit in the 2024 Regulations.

Standard name
Electricity Supply Code, Standards of Performance
Primary topics
Advisory committees, Consumer representation

Read with this

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document