Punjab State Electricity Regulatory Commission (Electricity Supply Code, Standards of Performance and Related Matters) Regulations, 2024
OrderDated 23 Oct 2024
Made under the Electricity Supply Code, Standards of Performance and Related Matters Regulations, 2024.
Summary
Summary written by software, from pages 1 to 36 of 142. Check the regulator's original before you rely on it.
This is PSERC's order dated 23.10.2024 disposing stakeholder objections to the draft Punjab State Electricity Regulatory Commission (Electricity Supply Code, Standards of Performance and Related Matters) Regulations, 2024 (p1). It records that the draft and explanatory memorandum were issued for comments by 25.07.2024, a public hearing was held on 07.08.2024, fifteen stakeholders including PSPCL objected, and PSPCL replied by memo dated 12.09.2024 (p1–2).
The bulk of the supplied text is a clause-by-clause record of objections, PSPCL's reply, and the Commission's analysis and decision. The Commission settles definitions in Regulation 2 — Days, Distribution main, Essential services, Feeder, Franchisee, Housing Society, Industrial supply, Premises, Sanctioned/Contracted Load, Service Line and Temporary Connection — accepting some changes and rejecting others (p2–8). It amends certain definitions, including Industrial supply, Premises and Contracted Load, and confirms that street lights are not essential services (p5–7).
It then deals with general provisions in Regulations 4–7: amendment procedure, supply voltage and load limits, duty to supply, security, EV charging connections and general terms (p8–16). Decisions confirm that revised supply-voltage limits apply prospectively, that no amount is recoverable from existing 11 kV consumers paying voltage surcharge when converting under amended limits, that EV charging load cannot be clubbed with other loads, and that prepaid-meter security exemption is to be reflected in Regulation 6(12) (p12–15).
Later sections address application and load matters in Regulations 8–12: connected-load computation and Annexure-1, A&A forms, demand notices, proof of identity/ownership, NOCs, and colony/complex load planning norms (p16–36). The Commission retains the existing connected-load methodology, allows Aadhaar as identity proof, requires the licensee to give an A&A copy on demand, requires NOC lists within one month, and discusses developer/PSPCL issues on colony loads, system loading charges and land for substations (p16–36). Later parts are not available.
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 27 Feb 2026Supply Code Review Panel Constitution Notification, 2026
- Dated 17 Mar 2026Electricity Supply Code, Standards of Performance and Related Matters, 2024 — 1st and 2nd Amendment, 2026 — Order
- Dated 25 Mar 2026Electricity Supply Code, Standards of Performance and Related Matters, 2024 — 2nd Amendment Regulations, 2026 — Order
- Dated 2 Jul 2026Electricity Supply Code, Standards of Performance and Related Matters, 2024 — 3rd Amendment, 2026 — Order
Procedures and orders made under it
- Dated 7 Aug 2025Supply Code Review Panel Constitution Notification, 2025
Consolidated copies, for reference (1)
Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.